29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

List of Figures<br />

Figure 1.1: Study Area boundary .................................................................................................... 5<br />

Figure 1.2: Schematic diagram of the measurement method .......................................................... 6<br />

Figure 2.1: Location map of proposed bridge and worksites....................................................... 13<br />

Figure 2.2: Locality map showing sensitive environments and marine protected areas .............. 14<br />

Figure 2.3: Proposed site plan (Reduced Version) ....................................................................... 15<br />

Figure 2.3a: Project foot print and Potential Affected Areas at bridge site .................................. 16<br />

Figure 2.3b: Project foot print and Potential Affected Areas at borrow site ................................ 17<br />

Figure 2.5 Typical Cross-section of the Bridge ............................................................................ 18<br />

Figure 2.6: Standard Cross-section of Concrete Box Girder of Main Bridge .............................. 19<br />

Figure 2.7: Standard cross-section of the approach bridge ........................................................... 20<br />

Figure 2.8 Standard Cross-section of Subgrade ............................................................................ 20<br />

Figure 2.9: Cross section Diagram of Approach Embankment .................................................... 22<br />

Figure 2.10: Schematic Diagram for Plane Layout of Precast yard on Hulhumale Island ........... 23<br />

Figure 2.11: Layout of Construction Site on Male’ Island ........................................................... 24<br />

Figure 2.12 Schematic Diagram for Plane Layout of Construction Site on Airport Island .......... 25<br />

Figure 2.13: Schematic Diagram for Main Control Conditions on Topography and Land Features<br />

for the Bridge ................................................................................................................................ 26<br />

Figure 2.14: Integral Steel Casing Platform and Bottom Steel Cofferdam Structure Diagram .... 28<br />

Figure 2.15: Process Flow Diagram for Construction Technology of Integral Steel Casing<br />

Platform + Bottom Steel Cofferdam ............................................................................................. 29<br />

Figure 2.16 Self-elevating mobile platform .................................................................................. 32<br />

Figure 4.1: Monthly Frequencies of Wind Direction in Central Maldives based on National<br />

Meteorological Center 10 year Data (adapted from Naseer, 2003). ............................................. 56<br />

Figure 4.2: 24 Year Wind Frequency Recorded at National Meteorological Center. .................. 56<br />

Figure 4.3: Mean Daily Wind Speed and Direction Recorded at National Meteorological Centre<br />

(1978 – 2004) ................................................................................................................................ 57<br />

Figure 4.4: Mean Monthly Rainfall in Hulhule’ (1975-2004)...................................................... 58<br />

Figure 4.5: Maximum daily rainfall by year in Hulhule’ (1975-2005) - (Source: Hay, 2006) ..... 58<br />

Figure 4.6: Maximum Temperature by year in Hulhule’- 1975-2005 (Source: Hay, 2006) ........ 59<br />

Figure 4.7: Picture of coast and tide in bridge location ................................................................ 61<br />

Figure 4.8: Rising and falling field during spring tide.................................................................. 61<br />

Figure 4.9: Flow direction process of mean flow speed for layered and vertical line at 1 # survey<br />

point .............................................................................................................................................. 66<br />

Figure 4.10: Flow direction process of mean flow speed for layered and vertical line at #2<br />

survey point ................................................................................................................................... 66<br />

Figure 4.11: Estimated wave patterns aorund Gaadhoo Koa ........................................................ 68<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|x

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!