29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Damage to<br />

cooling water<br />

pipes of STELCO<br />

Increase in traffic<br />

congestion in<br />

Male’<br />

Information sharing<br />

and consultations with<br />

service providers and<br />

regulators<br />

Route planning and<br />

traffic management<br />

controls<br />

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Careful supervision of work<br />

Introduce convenient and<br />

comfortable public<br />

transport - buses<br />

Rush hour Route planning Introduce a circle line<br />

(loop) of public transport<br />

- loop<br />

Pressure on<br />

parking<br />

Multi-storey car parks<br />

Impact on<br />

recreation<br />

Impact on surfing<br />

Increased<br />

demand on social<br />

services in Male’<br />

Accidents and<br />

Safety<br />

Occupational<br />

health and safety<br />

Employment<br />

Economic Impact<br />

and Livelihoods<br />

Social conflicts<br />

Train local workers,<br />

wherever possible.<br />

Ensure wide<br />

dissemination of<br />

information to all<br />

stakeholders<br />

Ensure fair competition<br />

by creation of a level<br />

playing field.<br />

Ensure access to<br />

information and<br />

transparency in<br />

decisions.<br />

Undertake public<br />

Alternative locations for<br />

football, fitness,<br />

children’s parks should<br />

be provided<br />

Easy and affordable<br />

access to other surf spots<br />

Increase the quality and<br />

access to number of<br />

schools, hospital and<br />

services in Hulhumale’.<br />

- Helmets, seatbelts,<br />

reflectors, security<br />

cameras, proper lighting<br />

International offshore<br />

construction standards and<br />

national regulations and<br />

national health sstandards<br />

shall be followed<br />

Wherever possible, use local Same as construction<br />

labour for construction stage.<br />

Retraining of workforce if<br />

necessary<br />

Create awareness on<br />

grievance redress procedure<br />

Ensure project<br />

performance information<br />

project results are widely<br />

shared<br />

Same as construction<br />

stage.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!