EIA for the proposed Hulhule-Male’ Bridge Project<br />

Maldives Airports Company Limited<br />

Date: 22 nd June 2015<br />

Time: 11:00<br />

Location: Ministry of Housing and Infrastructure<br />

Participants:<br />

1. Ibrahim Thoha- GM- AFM<br />

2. Abdulla Mufeed- GM- Aerodrome<br />

3. Mirfath Shafeeq- GM Project Cordinator<br />

4. Ibrahim Hameed- SATCO<br />

5. Adnan Ali- CDO<br />

6. Mohamed Solih- DCO<br />

Consultation with the Maldives Airports Company Limited (MACL) was carried out on 22 nd<br />

June 2015 at the Ministry of Housing and Infrastructure.<br />

The main role of MACL in the bridge project is to provide a road for public to pass through. The<br />

first concern raised by the MACL was regarding the plan to use the existing road in Hulhule’ to<br />

link Male’ and Hulhumale’. According to MACL, currently there is no runway separation barrier<br />

between the runway and the road connecting Hulhule’ and Hulhumale’. To ensure the safety of<br />

the public, MACL has consulted Ministry of Housing and Infrastructure to install traffic lights as<br />

a mitigation measure. However, MACL points out that this will cause the road to be blocked for<br />

about 10 minutes every time a flight lands, creating traffic and subjecting Bridge users to a long<br />

waiting time in the traffic. According to MACL, this problem would not be an issue after the<br />

new runway, which is planned to be built before the bridge becomes operational.<br />

MACL also raised concern over the narrow width of the road in Hulhule’ compared to the<br />

number of lanes on the bridge. It is expected that a traffic bottleneck will be created at the point<br />

of connection between the Bridge and Hulhule’ if the existing road in Hulhule’ is not widened.<br />

However, widening the road requires a lot of space from Hulhule’ island, which is a big plan for<br />

Hulhule’ island requiring advance planning. MACL believes that any plans to widen the existing<br />

road needs to be planned together with the Bridge project.<br />

MACL requires information on the speed of vehicles and the entry points to Hulhumale’ to plan<br />

land allocation in Hulhule’ for bridge and other purposes. Several entry points would mean that a<br />

large land area will be needed from Hulhule’. Additionally, MACL anticipates that the proposed<br />

Bridge project will require some form of Parking in Hulhule’, thus they have planned for a<br />

minimum of 600 parking lots for cars. Motorbikes will not be allowed to enter the airport<br />

according to the current plans of MACL.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|284