29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Ministry of Environment and Energy<br />

Date: 2 nd July 2015<br />

Time: 13:00 – 14:00<br />

Location: 4F, Meeting Room Ministry of Environment and Energy, Green Building,<br />

Participants:<br />

1. Ahmed Ali, Director General, Ministry of the Environment and Energy<br />

2. Afsal Hussain, Assistant Director, Ministry of Environment and Energy<br />

3. Abdulla Mohamed Didi, Deputy Minister, Ministry of Environment and<br />

Energy<br />

4. Muawiyath, Director General, Ministry of Environment and Energy<br />

5. Nafha Aujaz, Environment Analyst, of Ministry of Housing and Infrastructure<br />

(representing proponent)<br />

6. Shahdha Shiyam, Environmental Consultant – Sustainable Development, of<br />

CDE Consulting<br />

7. Mohamed Faizan, Environmental Consultant, of CDE Consulting<br />

The purpose of this meeting was to present the conceptual plans for the proposed bridge<br />

connecting Malé and Hulhulé Island to the participating stakeholders, and gather their views,<br />

concerns and recommendations to the plan. Nafha presented the conceptual plans to the<br />

participants<br />

MEE has undertaken in-depth studies of the plans of the bridge, and have undertaken feasibility<br />

studies on the possibilities of installing solar panels to generate energy. The ministry has decided<br />

not to install PVs on the bridge given the high maintenance cost.<br />

These findings have been shared with the proponent (Ministry of Housing and Infrastructure).<br />

Requested the outcomes of the findings of the EIA to be shared with the stakeholders for<br />

comments.<br />

Proper measures should be taken to prevent and reduce impacts of potential collision of boats<br />

with the pillars of the bridge; these include use of fenders, markers etc.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|278

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!