29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Table 9.1: Before construction monitoring plan<br />

Monitoring<br />

aspect<br />

Seawater<br />

quality<br />

Noise levels<br />

Marine<br />

ecology<br />

Indicators Locations Methodology Frequency of<br />

monitoring<br />

The following parameters will<br />

Surveys sites W1, Water samples tested Once prior to<br />

be tested:<br />

W2, W4, W6, at a certified commencement of<br />

Temperature, Salinity, pH,<br />

W7, W10, W9 laboratory or using construction<br />

Turbidity, Sedimentation rate, (See survey certified equipment activities<br />

Total Suspended Solids, Nitrate, locations map)<br />

Phosphate,<br />

Sulfate,<br />

Hydrocarbons, BOD, COD,<br />

Nitrogen ammonia<br />

Equivalent day and night time Surveys sites N1<br />

Using noise meter Once prior to<br />

noise levels (Leq) in dBA – N12 (See<br />

(continuously for 24 commencement of<br />

survey locations<br />

hrs) at continuous construction<br />

map) & at monitoring receptors activities<br />

Hulhule southern and at selected<br />

tip<br />

intervals for the rest<br />

Indicator species density and<br />

diversity<br />

Sighting of Maldivian marine<br />

Surveys sites T1 –<br />

T7 (See survey<br />

locations map) &<br />

LIT surveys, and Fish<br />

census<br />

Visual observations<br />

Once prior to<br />

commencement of<br />

construction<br />

Applicable<br />

standards<br />

Maldivian marine<br />

water monitoring<br />

standards<br />

provided by EPA<br />

Manufacture<br />

specifications for<br />

machineries/equip<br />

ment noise<br />

WHO guidelines<br />

for community<br />

noise 1999 for<br />

industrial and<br />

commercial area<br />

Maldivian marine<br />

protected life<br />

Est. Total<br />

Costs RF 4<br />

Rf 10,400<br />

Rf 2500-3000<br />

Rf 7000 –<br />

14,000<br />

4 Estimates based on current market rates<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|232

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!