EIA for the proposed Hulhule-Male’ Bridge Project<br />

As note earlier, there is also no long term data and information regarding the particular site<br />

under consideration, which makes it difficult to predict impacts. It is important to consider that<br />

there will be uncertainties and voluntary monitoring of natural processes as described in the<br />

monitoring programme is absolutely essential.<br />

Similar projects, at this scale, have not been undertaken in the Maldives and similar scale project<br />

in coral reef and atoll environment setting is rare. This poses a challenge in accurately predicting<br />

the impacts from the project<br />

Table 11.1: EIA study aspects and their limitations<br />

Issue/Item Required Information Current Status / action<br />

Detailed Master A broader Master Plan for the region There is no detailed master plan.<br />

Plan of the Male’<br />

Urban region<br />

Engineering<br />

designs<br />

Detailed engineering designs such as<br />

M&E and structural designs<br />

Details can only be worked out<br />

after the EIA approval.<br />

Details of the Exact model of equipment<br />

Use typical equipment details<br />

utility machinery<br />

and equipment<br />

Geological studies Detailed seismic and geotechnical<br />

studies of Male’.<br />

Borehole data<br />

Data not available at local level;<br />

use broad level studies undertaken<br />

for Maldives;<br />

Borehole data not ready<br />

Demand and road Detailed demand analysis and traffic Not available as this is the first of<br />

usage<br />

forecast for 10 years<br />

its kind; use ferry traffic as proxy<br />

Environmental Detailed data on geology, Baseline snapshots of the site taken<br />

baseline data hydrogeology and soil.<br />

Air quality measurements<br />

to design mitigation measures<br />

Estimated based on other similar<br />

Up-to-date Socio-economic data of studies in Maldives<br />

Male’<br />

Primary date collection will be time<br />

consuming; Secondary sources will<br />

be used<br />

Environmental<br />

Standards<br />

Environmental Standards for Air and<br />

Noise Quality<br />

USEPA standards followed<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />