HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

4. Ministry of Youth and Sports<br />

5. Relevant Associations and Surf School<br />

6. State Electric Company Limited<br />

7. Maldives Water and Sewerage Company<br />

8. Dhiraagu<br />

9. Ooredoo<br />

10. Maldives Transport Authority<br />

11. Maldives Transport and Contracting Company<br />

12. Maldives Ports Limited<br />

13. STO<br />

14. Maldives Airport Company Limited<br />

15. Maldives Civil Aviation Authority<br />

16. MNDF Coast Guard<br />

17. Traffic Police<br />

18. Ministry of Fisheries and Agriculture<br />

19. Marine Research Centre<br />

20. Ministry of Tourism<br />

21. Ministry of Environment and Energy<br />

22. Environment Protection Authority<br />

23. Maldives Meteorological Department<br />

24. Tourist Resorts nearby Male’<br />

Consultations were also held with the general public of greater Male’ area. Two main surveys<br />

were conducted to get the opinions of the public regarding the proposed project. A ferry user<br />

survey was conducted for the customers using Male’-Hulhule’ and Male’-Hulhumale’ in order to<br />

understand their purpose of travel, advantages and disadvantages of their current mode of travel<br />

as well as their opinion on the proposed project. Targeting peak and off-peak hours of the ferries,<br />

a total of 467 ferry users were interviewed for this survey. A further survey was also conducted<br />

for the public of greater Male’ area to understand their opinion and concerns regarding the<br />

project. A total of 380 respondents took part in the public survey.<br />

Questionnaires used for both surveys are presented in Appendix M.<br />

1.8.5 Data Analysis<br />

The EIA experts used their experience and knowledge in their respective fields to analyze the<br />

data from the previous studies and field visits in order to determine the potential impacts of the<br />

proposed projects, the severity of effects arising from these impacts and how any adverse<br />

impacts can be best mitigated and positive impacts enhanced. This analysis provides the<br />

framework for the recommendations on corrective actions and remedial measures and provides<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|9