EIA for the proposed Hulhule-Male’ Bridge Project<br />

Executive Summary<br />

The purpose of this document is to fulfil the requirements to get necessary environmental<br />

clearance from the Environmental Protection Agency (EPA) to carry out the proposed Hulhule-<br />

Male’ Bridge Project. The proponent of this project is Ministry of Housing and Infrastructure<br />

(MHI). This EIA has been prepared by China Shipping Environment Technology (Shanghai) Co.<br />

Ltd, China and CDE Consulting, Maldives.<br />

The project involves the construction and operation of a bridge linking Hulhule and Male’ Island<br />

across Gaadhoo Koa atoll pass. This is the first bridge of its kind in the Maldives. The total<br />

length of the proposed bridge is 2 km; the section of the bridge that covers the overwater area<br />

across Gaadhoo Koa channel is 1.39 km. The elevation of the bridge is 20 m. The width of the<br />

bridge is 20 m and there will be four lanes and pedestrian/bicycle lanes. The bridge landing area<br />

on Malé side is next to the Tsunami Monument and onto the Boduthakurufaanu Magu. The<br />

landing area on Hulhule’ is on the southern tip of Hulhule Island. The landing area that connects<br />

with Hulhule needs some land reclamation and shore protection. The source of sand for<br />

reclamation is a proposed harbour at Gulhifalhu Island. The duration of the proposed project is<br />

two years. The projects sites cover the bridge landing areas on the SE corner of Male’ (next to<br />

Tsunami monument), bridge approach located on the reef slopes of Male’ and the bridge main<br />

span located in the deep waters of Gaadhoo Koa. In addition, there will be a casting yard in<br />

Hulhumale’, a worksite in Hulhule and a worksite in Male’ located in “Adi Park”. The project is<br />

expected to employ about 480 persons of which specialist foreign labour will consist of 120<br />

persons and the rest are expected to be sourced from local workforce.<br />

The main rationale for the Hulhule-Malé Bridge is to increase the social development and<br />

economic opportunities in the Malé urban area. One of the biggest bottlenecks to the full<br />

utilization of Malé-Hulhule-Hulhumale as contiguous unit is the absence of land links. The<br />

bridge will link both the airport and Hulhumale’ to Malé and is part of a broader masterplan to<br />

link all the islands within Malé Urban Region spanning from Hulhumale’ to Thilafushi. The<br />

objective of this project is to develop the Malé and Hulhule section of the overall link.<br />

All project activities will be in conformance to the laws and regulations of the Maldives, and<br />

relevant international conventions that Maldives is party to. The key laws and regulations<br />

applicable to this project are Environmental Protection and Preservation Act, The Civil Aviation<br />

Act 2001, Decentralization Act, General Laws Act 4/68 and Law on Cultural and Historical<br />

Places 27/79. The key regulations applicable to this project are , Environmental Impact<br />

Assessment (EIA) Regulation 2012, Civil Aviation Regulations, Sand and Coral Mining<br />

Regulation, Regulation on Dredging and Reclamation, Regulation on cutting down trees,<br />

Dewatering Regulation, Waste Management Regulation 2013 and Regulation on Environmental<br />

Damage Liabilities 2011/R-9. This EIA is prepared based on the EIA Regulation 2012.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />