EIA for the proposed Hulhule-Male’ Bridge Project<br />

The reasons for the high noise level around N10 and N11 during day time may have been<br />

associated with construction activities on a building nearby. Night time readings were higher in<br />

all locations, mainly due to traffic, perhaps associated with Ramazan period. Measurements<br />

taken inside the building at N2, N3, N6 and N8 also showed unusually higher readings during<br />

night due to traffic. The higher readings at Senahiyaa hospitals were associated with the fans<br />

inside the building.<br />

Vibrations were not observed at any of the sites surveyed.<br />

4.6.2 Air Quality<br />

Ambient air quality measurement was not undertaken at the site due to the limited time available<br />

for this EIA. Instead, readings from the Male’ monitoring sites established by EPA have been<br />

presented here.<br />

The 24 hourly PM 10 values recorded at Hukuru Miskiiy between 2010 and 2012 1 range between<br />

7.90 – 21.94 µg/m 3 . Measurements at Villingili Island in 2011 2 were recorded at a similar range<br />

at 13.0 µg/m 3 .<br />

4.7 Recreational Resources<br />

4.7.1 Parks and recreational areas<br />

The SE corner of Male’ is considered one of the main recreational areas of the island. The<br />

distribution of recreational parks in the area is presented in Figure 4.49. Among these parks, the<br />

following parks will be directly affected during the project. Table below provides a list of the<br />

parks in the vicinity and how they are affected.<br />

Table 4.15: Parks and recreational areas in the vicinity<br />

Site Current use Affects from the project<br />

Adi Park<br />

Sports activities. Includes 4 small Whole area is to proposed to be<br />

dirt football or futsal pitches used as a work site during<br />

construction stage and not<br />

accessible to public. Planned to<br />

be redeveloped after the bridge<br />

project.<br />

Helipad area Used as an emergency helipad. Not currently proposed as a<br />

1 Data provided EPA<br />

2 CDE 2012, EIA for the proposed Solid waste management facility at Thilafushi, Male’,<br />

Maldives<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!