HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

1.4 Project Rationale, Aim and Objectives<br />

The main rationale for the Hulhule-Male’ Bridge is to increase the social development and<br />

economic opportunities in the Male’ urban area. One of the biggest constraints to the full<br />

utilization of Male’-Hulhule-Hulhumale as contiguous unit is the absence of land links.<br />

This project will enable the linking of Male’ to Hulhule. It is critical to have a land link between<br />

the capital Male’ and the international airport that serves the capital. The international airport<br />

presently receives about three million international passengers and 796,333 domestic passengers<br />

every year. The planned airport expansion and redevelopment envisages arrival of over 5 million<br />

tourists to the Maldives every year.<br />

Hulhumale’ currently hosts a population of 30,000. By the end of phase II development,<br />

Hulhumale’ is expected to have a resident population of about 200,000. The bridge will allow<br />

for the full integration of the Hulhumale’ residential population as an integral part of the Male’<br />

urban area. The bridge will provide essential access to services such as schools, hospitals, sports,<br />

recreation and entertainment. The bridge will also facilitate daily commuting for employment<br />

and business purposes.<br />

The bridge development is envisaged to provide new and additional economic opportunities for<br />

businesses in the Male’ urban area and improve the economic competitiveness of the Maldives<br />

as a whole.<br />

The aim of this project is to link the two main settlements in Male Urban Region – Male’ and<br />

Hulhumale’. The project is part of an overall master plan to link all islands within the Male’<br />

Urban Region group.<br />

The object of this project is to build a bridge linking Hulhule and Male’ and subsequently to<br />

Hulhumale via the existing roads between Hulhule and Male’.<br />

1.5 Consultants, Contractors and Government Institutions<br />

All the EIA related work is undertaken by consultants from China Shipping Environment<br />

Technology (Shanghai) Co. Ltd (CSET), China and CDE Consulting, Maldives. The project<br />

engineer is CCCC Highway Consultants Co. Ltd, China.<br />

The project is executed by Ministry of Housing and Infrastructure<br />

1.6 Project Financing<br />

The project is to be financed with the assistance of Chinese Government, Chinese banks and<br />

Maldivian Government. The estimated project cost is between US$250-300 million. The<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|2