EIA for the proposed Hulhule-Male’ Bridge Project<br />

Table 8.1: Environmental Management Plan for construction and operation phase<br />

Activity Management measures Responsible party Timing<br />

Training of staff and<br />

contractors<br />

All construction workers and project management staff will be provided<br />

information on general environmental issues, compliance with<br />

environmental permits and EMP.<br />

All staff involved with environmental monitoring will be provided<br />

training in environmental monitoring procedures.<br />

Project proponent &<br />

Environmental<br />

Consultant<br />

Before<br />

commencement of<br />

construction<br />

activities<br />

Health checks conducted prior to the commencement of project.<br />

Inform the general public on the project activities.<br />

non-<br />

and<br />

Documenting<br />

conformances<br />

corrective actions<br />

All non-conformances to the environmental permit conditions, observed<br />

during monitoring will be documented.<br />

Necessary corrective actions and preventative actions will be identified.<br />

Project proponent &<br />

Environmental<br />

consultant<br />

Continuous during<br />

construction phase<br />

Corrective actions will be implemented, with systematic follow ups to<br />

ensure effectiveness of these measures.<br />

Supervision of project<br />

activities<br />

Assign appropriately experienced and qualified personnel to supervise<br />

the entire project and ensure that all activities are carried out with<br />

minimal adverse impact on the environment.<br />

Project proponent<br />

Before<br />

commencement of<br />

the project<br />

Traffic management<br />

Inform local authorities to close the area during the implementation<br />

phase and implement a traffic diversion plan with assertive signboards<br />

to manage traffic.<br />

Project proponent<br />

Before<br />

commencement of<br />

the project<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|216