EIA for the proposed Hulhule-Male’ Bridge Project<br />

Input resource(s) Source/Type Method of obtaining materials<br />

Water supply (during<br />

construction)<br />

Electricity/Energy<br />

(during construction)<br />

varnish, lacquer, thinner...etc.<br />

Desalinated water MWSC and portable<br />

Diesel/Electricity<br />

desalination plant<br />

STELCO and portable power<br />

plant<br />

Machinery See Tables 2.3 to 2.6 Import or hire locally where<br />

Temporary<br />

for workers<br />

housing<br />

Food and Beverage<br />

Fuel, Kerosene and<br />

LPG<br />

Operation<br />

Prefabricated houses installed<br />

Mainly imported sources except a<br />

few locally available products.<br />

Light Diesel, LPG Gas, Petrol,<br />

Lubricants<br />

available<br />

Import from China<br />

Import and purchase locally<br />

Local suppliers<br />

Electricity supply Diesel STELCO<br />

Operational staff Not decided by government yet Recruiting agencies<br />

Machinery Maintenance vehicles for road<br />

surfacing and simple maintenance<br />

works<br />

Table 2.8: Major Project Outputs<br />

Products and waste<br />

materials<br />

Anticipated<br />

quantities<br />

Import or hire locally<br />

Method of disposal<br />

Construction waste Large quantity Disposed in Thilafushi Island<br />

Slurry from drilling<br />

activities<br />

Large quantity<br />

Disposed in Thilafushi Island<br />

Waste oil Moderate quantities Barrelled and sent to Thilafushi site<br />

Green Waste Very Small quantities Disposed at Thilafushi; transplanted<br />

Excavated earth Very Small quantities Reused for backfilling<br />

Hazardous waste (diesel) Moderate quantities Barrelled and sent to Thilafushi site<br />

Noise 70- 80 dBA No special measures will be taken<br />

Sewage Moderate quantities Disposed directly to sea; MWSC<br />

2.9 Demobilization<br />

The proponent advocates a phased demobilization plan to commence in the last week of the<br />

contract. Machinery transported from overseas will have to be demobilized on one specific date.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology Page| 38