EIA for the proposed Hulhule-Male’ Bridge Project<br />

measures shall be taken to consider transplanting options for this tree.<br />

The scope of activities that occupies land spaces for permanent and<br />

temporary construction features shall be controlled as strictly as<br />

possible. All the construction activities must be confined to the proposed<br />

site.<br />

The removal of any vegetation outside the proposed site is strictly<br />

forbidden.<br />

Upon completion of the bridge construction, the contractor shall clear<br />

the site, replant any necessary vegetation and/or return the land to its<br />

previous land owner.<br />

Health and safety of<br />

construction staff<br />

Experienced personnel shall be appointed to instruct and supervise<br />

work.<br />

Project proponent<br />

Continuous, during<br />

construction phase<br />

First aid kit and evacuation facilities shall be made readily available on<br />

site at all times.<br />

Site will be made accessible only to authorise personnel and the area<br />

will be fenced off temporarily to restrict access to the general public.<br />

Work will be carried out during calm weather conditions for offshore<br />

boreholes.<br />

Chemicals and hazardous materials used on the vessel shall be safely<br />

stored and secured.<br />

As much as possible, work shall be carried out during the daytime.<br />

Safety precaution boards shall be erected on site.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />