EIA for the proposed Hulhule-Male’ Bridge Project<br />

No. 24 pier is the transition pier of the main bridge, without the pier body. The pier foundation<br />

scheme is planned to use 4 cast-in-place piles with 1.5 m of diameter, and bearing platform is 2.5<br />

m high, with 6.25 (axial direction) × 6.25 m (transverse direction) of plane dimension.<br />

No. 25 and 26 pier bodies are T-type piers, with 2.0 (axial direction) × 4.0 m (transverse<br />

direction) of sectional dimension. The pier foundation scheme is planned to use 4 cast-in-place<br />

piles with 1.5 m of diameter, and bearing platform is 2.5 m high, with 6.25 (axial direction) ×<br />

7.0 m (transverse direction) of plane dimension.<br />

No. 27 abutment of the Airport side shall adopt pier foundation, with 1.5 m of diameter.<br />

2.3.2.5 Design scheme of breakwater<br />

The bridge on the side of airport joins with land via shore-connecting approach embankment<br />

about 115 m in length. A dyke will be constructed around the embankment which will serve as<br />

the breakwater. The core of the breakwater will consist of sand filled geobags, filter cloth and a<br />

rubble cushion layer. The proposed design includes, 0.8 t quadrangle hollow blocks for wave<br />

armour block. The width of approach embankment pavement is 20.3 m with 1:2 for gradient on<br />

both banks. Cast-in-situ concrete anti-billows wall is set on both sides of dyke top. A drain ditch<br />

is set in the rear of wall. The embankment toe (about 5 m wide) will be protected using 150-200<br />

kg apron or rubble and riprap.<br />

Figure 2.9: Cross section Diagram of Approach Embankment<br />

2.3.3 Proposed work sites<br />

2.3.3.1 Precast yard at Hulhumale’<br />

The precast yard is a 40,000 m 2 (160 × 250m) area located at the newly reclaimed section of<br />

Hulhumale Island (See Figure 2.10). The site will be mainly used for fabricating I-type beam on<br />

the superstructure of approach bridge. The site includes precast yard area, I-type beam storage<br />

area, reinforcement processing and storage area, steel structure processing area, mixing station,<br />

sandstone stockpiling yard, equipment parking area, materials storage area, power generator<br />

house, parts warehouse, site laboratory, Office and living area and temporary construction wharf.<br />

Major equipment includes gantry crane, generator, mixing station, and wheel type beam carrier<br />

vehicle. Main construction materials and equipment are transported via the sea and unloaded<br />

Prepared by: CDE Consulting & China Shipping Environment Technology Page| 22