29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Advantages<br />

reef slopes of Male island can be avoided<br />

• Traffic diversion problems around the<br />

south-east area of Male’ island can be<br />

avoided during the construction phase<br />

Disadvantages<br />

be one of the reasons for the present<br />

Government got elected.<br />

• Public dissatisfaction among concerned<br />

stakeholders that currently use the work<br />

areas and proposed bridge areas (i.e.<br />

surfers concern relating to the bridge<br />

location, recreational facility loss due to<br />

the Male work site, etc.) can be avoided<br />

• Potential accidents associated with the<br />

bridge can be avoided.<br />

• Costs related to diverting cargo shipping<br />

traffic to another channel can be avoided<br />

and closure of Gaadhoo Koa for 2 years<br />

for all local traffic (during construction)<br />

can be avoided.<br />

• Avoid further national debt from the<br />

estimated $170 million loan for the<br />

project<br />

• Avoid further migration from outer atoll<br />

to Male’ due to increased housing<br />

In summary, the presence of a bridge will be a welcome boost to the economic activities and<br />

mobility between Male’ and Hulhumale’. Its economic and social benefits are expected to be<br />

extremely positive in the long run. However, the bridge may not be considered an immediate<br />

necessity at this stage of development in the Maldives, given the numerous more urgent<br />

investments required in the social and economic sector. Thus, on economic and social grounds,<br />

the no project option is viable in the short-term. However, given that the bridge is a presidential<br />

election campaign promise by the present Government and since bilateral negotiations with the<br />

Chinese Government is at an advanced stage, the ‘no project’ option is not viable on political<br />

grounds.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|196

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!