HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

l\--:t!<br />

@F<br />

"lthh-l*n'- Alw.ta l.ktvid, aofu Ld.F d.nt<br />

-2.2-<br />

2Py?tt<br />

ter2trt--<br />

Environmental Protecrion egency f p[<br />

. Project management (include scheduling and duration of the project; construction details,<br />

labour requirement, housing of temporary labour, construction/operation/closure of labour<br />

camps, Emergency plan in case of spills (diesel, grease, oil)access to site, safety, equipment<br />

and material storage, fuel management and emergency plan in case ofspills)<br />

Details ofthe Bridge<br />

. Location, route alignment& key featuresofthe bridge on an A.3 scaled map<br />

o Traffic forecasts and estimates<br />

o Design details ofthe bridge. These should be described for the bridge landing areas, approach<br />

and main bridge sections.<br />

o Justification for the location ofbridge<br />

o Method and equipment used for construction<br />

Construction of bridge foundation and oiers:<br />

o Location and size ofpiersand foundations on a scaled map;<br />

. Engineering details ofthe foundation<br />

. Justification for the selection ofthelocation, depth and size ofpiers;<br />

o Method and Equipment used for the construction piers and foundation, including equipment<br />

capacity and description ofconstruction; Foundation construction methods must be described<br />

for on land, reef flat, reef slope and deep water construction.<br />

o Method ofpositioning and anchoring for marine vessels<br />

Construqtion activities<br />

o Location and size ofconstruction camps (use maps), and justification for choosing the sites;<br />

. Identiry equipment, material and storage requirements for construction camps;<br />

o Methods and routes for transporting material including precast and steel units<br />

. Disposal methods of domestic garbage, wastewater and slurry;<br />

. Project management(include Emergency plan in case of spills (diesel, grease, oil), safety,<br />

equipment and material storage, fuel management);<br />

. Construction waste management plan;<br />

. TraIfic management plans<br />

Sand Sourcing<br />

o Sand requirements<br />

. Location, size and depth ofbonow area<br />

o Dredging method<br />

. Sand transportation methods<br />

The EIA report should investigate possibilities for altematives:<br />

o Altemative location and alignment scheme of the bridge;<br />

o Altemative designs and style of the bridge;<br />

o Altemative construction methods for foundations, bridge piers and sections;<br />

o Altemative sand sourcing options<br />

o Altemative construction camp sites<br />

Have these been considered and ifso, give arguments why these ahematives have not been selected.<br />

Task 2. Description of the €nvironment - The EIA should undertake the following environmental<br />

baseline field studies to assist the description of the existing environment and subsequently the<br />

Gc.n Bu din!,3'd Fl@r, H.ndhuv..eeHinsun<br />

M.l.', i.p. ol Maldiv.r,20392<br />

T.r: I'9Eol 333 s949 1+9601 333 5951<br />

F.x:<br />

l+9601333 59s3<br />

t.cr.t..i:t@.p..gov.mv