EIA for the proposed Hulhule-Male’ Bridge Project<br />

Impact area Potential impacts Nature/ Distribution/<br />

Duration/ Magnitude<br />

Marine water quality<br />

Marine life<br />

Terrestrial flora &<br />

fauna<br />

Ground water<br />

quality<br />

Impacts on soil<br />

Land traffic<br />

Water pollution;<br />

During construction of the bridge, some chemicals and oils spillages may<br />

occur, and have adverse effects on the marine water<br />

Permanent loss of corals and sessile organisms;<br />

Depending on the pile foundation location, some corals and sessile organisms<br />

maybe destroyed in the process.<br />

Near construction areas;<br />

Land connection construction areas will destroy some plants<br />

Water pollution;<br />

Some chemicals and oils spillages may occur, and have adverse effects on the<br />

ground water<br />

Impacts on soil and land capability<br />

Will predominantly be felt during construction activities land connection<br />

construction areas<br />

Near land connection construction areas & temporary construction<br />

areas;<br />

Roads near the land connection construction areas & temporary construction<br />

areas might have to be closed/diverted during the construction phase<br />

Direct/negative;<br />

Project site;<br />

Short term;<br />

Moderate negative change<br />

Direct/negative;<br />

Project site;<br />

Short term;<br />

Moderate negative change<br />

Direct/negative;<br />

Construction areas;<br />

Short term;<br />

Moderate negative change<br />

Direct/negative;<br />

Project site;<br />

Short term;<br />

Moderate negative change<br />

Direct/negative;<br />

Project site;<br />

Short term;<br />

Minor negative change<br />

Direct/negative;<br />

Project site;<br />

Short term;<br />

Moderate negative change<br />

Reversibility<br />

Reversible<br />

Significance<br />

coastal morphology<br />

Insignificant – Spillages are<br />

very unlikely<br />

Reversible<br />

Moderately Significant –The<br />

pile foundation will be huge,<br />

but live coral coverage is very<br />

low at proposed sites<br />

Reversible Moderately Significant –<br />

Dozens of trees need to be<br />

ported<br />

Reversible<br />

Reversible<br />

Reversible<br />

Insignificant – Spillages are<br />

very unlikely<br />

Insignificant<br />

Moderately Significant<br />

Navigation<br />

Near pile foundation;<br />

The sea route between Male’ and Hulhule might have to be temporarily<br />

closed/diverted during the construction phase<br />

Direct/negative;<br />

Project site;<br />

Short term;<br />

Moderate negative change<br />

Reversible<br />

Moderately Significant<br />

Aviation<br />

Near airport island side;<br />

Some construction process of the Bridge near airport island side might impact<br />

the aircraft take-off and landing<br />

Direct/negative;<br />

Project site;<br />

Short term;<br />

Reversible<br />

Insignificant - very short time<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|138