EIA for the proposed Hulhule-Male’ Bridge Project<br />

with the Hulhule-Hulhumale’ link road via the southern tip of Hulhule Island. Thus, the best<br />

landing points in terms of allowing traffic flow are the two proposed points. This site has also<br />

been finalised with extensive consultations with the Government agencies.<br />

In addition the proposed location offers better terrain to construct the bridge approach due to the<br />

presence of gentle reef slope. This is crucial as the bridge approach can take up considerable<br />

space on land as it has to be elevated. There is very limited space to spare in Male’ Island proper<br />

for the approach bridge.<br />

The location also offers the least impact location for traffic assimilation in terms of disturbance<br />

to the local buildings and houses in the vicinity.<br />

2.3.4.2 Justification for the location, depth and size of piers<br />

The main factors influencing the bridge design at the proposed location include submarine<br />

topography, aviation height limits, navigation clearance requirements and the deep water sea bed<br />

conditions. Based on these limitations and the principle of simple design used for the project,<br />

pre-stressed concrete V-shaped outrigger six-span continuous steel structure scheme is selected<br />

for main bridge.<br />

Male<br />

(breakwater spacing)<br />

Airport<br />

(Aviation<br />

height<br />

Navigation clearance: 12m<br />

li it) (mean sea level )<br />

Water depth: 46m<br />

(Width of deep slot)<br />

Figure 2.13: Schematic Diagram for Main Control Conditions on Topography and Land Features for the Bridge<br />

The design is controlled by factors such as aviation height limit on airport side, elevation at<br />

breakwater on Male’ side, design water level, wave height, location of intersection, water depth<br />

and scouring depth as well as the practicality during construction and aesthetic factors.<br />

The bridge pier location is determined in accordance with bridge type and spanning length<br />

scheme for main bridge and approach bridge. The foundation form and pile foundation depth are<br />

determined based on the geological investigation results, calculation results of structural bearing<br />

capacity and the bridge pier dimension.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology Page| 26