EIA for the proposed Hulhule-Male’ Bridge Project<br />

3329911-taxi centre<br />

They have a total of 92 taxis and approximately 135 drivers with full time and part-time drivers.<br />

There are total 3 operators working from the taxi centre.<br />

They place themselves in the second position in comparison with the other taxis.<br />

They expect to get more trips and increased revenue from trips for higher income.<br />

They do not expect disadvantage to taxi centres from the bridge project<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|307