EIA for the proposed Hulhule-Male’ Bridge Project<br />

D: During post-construction: The EPA and the MHI will agree to jointly prepare a postconstruction,<br />

post bridge completion report for their records. In addition, joint reviews by the<br />

Government and the contractor each year when the project is under implementation may also be<br />

conducted. The objective is to ensure the collection of reasonably complete and credible data<br />

from all participating project institutions on the key performance indicators and others.<br />

8.5 Evaluation<br />

The objective of evaluation is to judge the impact of implementation effectiveness. It will be<br />

done through independent consultants having experience in similar tasks. This will be<br />

undertaken during midterm and end of the project. The evaluation will assess the effectiveness<br />

of addressing environmental and social impacts of the project. The midterm evaluation will give<br />

feedback for the implementation of the bridge environmental impact management framework.<br />

8.6 Capacity Building<br />

Past experiences of similar projects suggest that the capacity of the government to deal with<br />

social and environmental issues is generally weak at all levels. The MEE and MHI therefore,<br />

will strengthen environmental training during the bridge construction phase through the<br />

following suggested measures:<br />

• Providing bridge and offshore infrastructure related training and awareness sessions to<br />

environmental policy makers<br />

• Providing Environmental Assessment and Monitoring training specific to bridge and<br />

offshore construction projects to EPA staff<br />

• Preparing manuals and guidelines on how to assess the environmental impacts of bridge<br />

and offshore construction projects.<br />

• Recruit or identify a Social, Environment and Safety Officer, who will be responsible for<br />

the following:<br />

o Liaison point for contractor to assist in following the procedures set out in this<br />

EIA, particularly the screening and approval processes.<br />

o Monitor the compliance of social and environment aspects related to bridge<br />

project.<br />

o First point of contact for Grievance Redress Mechanism<br />

• Social, Environment and Safety Officer must have a background in social and<br />

environmental management and be provided training specific to bridge and offshore<br />

construction projects<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|225