EIA for the proposed Hulhule-Male’ Bridge Project<br />

Table 7.4: Comparison Table of Main Bridge Foundation Construction<br />

Designing<br />

Scheme<br />

Bearing<br />

Capability<br />

Construction<br />

Scheme<br />

Pile-group Foundation<br />

• Bearing capacity meets the<br />

requirements.<br />

• Overall steel casing contributes to<br />

joint load carrying and has strong<br />

displacement control.<br />

Overall steel casing<br />

Caisson Foundation<br />

• Bearing capacity meets the requirements.<br />

• Poor displacement control<br />

Prefabrication installation<br />

Practicability<br />

Construction<br />

• Scheme is feasible.<br />

• Technology is mature; there are<br />

many successful projects cases in<br />

China.<br />

• Less process conversion,<br />

implementing common<br />

construction methods of bored<br />

piles after the steel casing group is<br />

in place.<br />

• Need to choose the proper time<br />

window, when hoisting the overall<br />

steel casing.<br />

• Scheme is feasible.<br />

• Technology is mature, less application in China.<br />

• The proper time window will need to be<br />

selected for floating transportation and<br />

installation of caisson.<br />

• The height of 1000 t floating crane is 80~100 m,<br />

exceeding aviation height limit demand of 45 m.<br />

• More process conversion: prefabrication on the<br />

basic semi-submersible barge, body pier, and<br />

height pier, floating transportation of caissons,<br />

sinking, basement excavation and levelling are<br />

conducted in the floating state.<br />

Period<br />

9 Months 8.5 Months<br />

Quality<br />

Safety<br />

Environment<br />

Protection<br />

• Difficulty of controlling the plane<br />

position of steel casing is larger.<br />

• It is easier to assure the quality of<br />

pile foundation construction.<br />

• The overall steel casing has a large<br />

volume and heavy weight load.<br />

• The transportation and installation<br />

activities during construction carry<br />

a certain level of safety risk.<br />

• The small area of the steel casing<br />

group has little influence on<br />

seabed and marine animals and<br />

plants.<br />

• Bored pile construction needs to<br />

be strictly controlled to avoid<br />

sedimentation (especially mud<br />

pollution).<br />

• The prefabrication is conducted in semisubmersible<br />

barges under a floating state, and<br />

thus its quality is greatly influenced by the<br />

environment.<br />

• The quality of the pier body’s joint height when<br />

floating on the water is greatly influenced by<br />

environment.<br />

• Handling of seabed basement has high quality<br />

demand, Difficulty of controlling the planned<br />

position and gradient of caissons installation is<br />

higher.<br />

• The pier body’s joint height when floating on<br />

the water carries a higher level of safety risk.<br />

• Transportation and installation of caisson via<br />

floating have greater safety risk.<br />

• The pit excavation area of caisson is larger,<br />

which has great impact on seabed and marine<br />

animals and plants.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|208