EIA for the proposed Hulhule-Male’ Bridge Project<br />

Figure 6.18 Design sketch after completion of proposed project (bird's-eye view) ................... 178<br />

Figure 6.19 Design sketch after completion of the proposed project (eye-level)....................... 178<br />

Figure 6.20 Perspective drawing on the bridge of the proposed project .................................... 179<br />

Figure 6.21 Perspective drawing of piers of approach bridge of the proposed project .............. 179<br />

Figure 7.1: Plan of Each Route Location Scheme ...................................................................... 197<br />

Figure 7.2: Schematic Diagram for Main Control Conditions on Topography and Surface<br />

Features for the Bridge................................................................................................................ 200<br />

Figure 7.4: General Structure of Pile-group Foundation for main pier (Unit: m) ...................... 206<br />

Figure 7.5: General Structure of Main Pier Caisson Foundation (Unit:cm)............................... 207<br />

Figure 7.6: Preferred altenative worksite in Male’ ..................................................................... 211<br />

Figure 8.1 : Environmental Management Strategy flow diagram............................................... 213<br />

Figure 8.2: Environmental Management Plan for construction and operation phase ................. 223<br />

List of tables<br />

Table 1.1: Fish abundance category................................................................................................ 7<br />

Table 2.1: Predicted Results on Traffic Volume for this Project (pcu/d) ..................................... 18<br />

Table 2.2: Proposed sand borrow area details .............................................................................. 27<br />

Table 2.3 Key equipment for the main bridge .............................................................................. 33<br />

Table 2.4 Key equipment for the approach bridge ....................................................................... 33<br />

Table 2.5 Key equipment for the type-I girder precast & installation .......................................... 34<br />

Table 2.6 Key equipment for land connection works ................................................................... 35<br />

Table 2.7: Major Project Inputs .................................................................................................... 37<br />

Table 2.8: Major Project Outputs.................................................................................................. 38<br />

Table 4.1: Key Meteorological Information of the Maldives ....................................................... 54<br />

Table 4.2: Summary of General Wind Conditions from National Meteorological Center ........... 55<br />

Table 4.3: Probable Maximum Precipitation for various Return periods in Hulhule’.................. 59<br />

Table 4.4: Tidal Variations at Hulhule International Airport ....................................................... 60<br />

Table 4.5: Design tide levels and tide ranges with different recurrence intervals in tide station of<br />

Airport Island (PIII) ...................................................................................................................... 60<br />

Table 4.6: Table for wave height calculation parameters ............................................................. 63<br />

Table 4.7: Effective wave height (m) and mean wave period (s) of SSE direction of the control<br />

points in the vicinity of bridge location ........................................................................................ 63<br />

Table 4.8: Maximum mean flow velocity and corresponding flow direction at the pier under the<br />

current conditions in different recurrence intervals (flow velocity: m/s, flow direction) ............. 69<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />