29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Ground<br />

Water<br />

Quality<br />

(ground<br />

water)<br />

protected species viz. marine<br />

turtles, clams, black corals,<br />

whale shark, dolphins, conch<br />

shell and lobster species<br />

The following parameters will<br />

be tested:<br />

Temperature, Salinity, pH,<br />

Nitrate, Phosphate, Total<br />

Coliform, Faecal coliform,<br />

Hydrocarbons<br />

Maldives victory<br />

dive site<br />

One from each<br />

site (Locations<br />

G1, G3, G4)<br />

activities<br />

Laboratory analysis Once prior to<br />

commencement of<br />

construction<br />

activities<br />

Maldivian (EPA)<br />

ground water<br />

monitoring<br />

standards (See<br />

Appendix A,<br />

Annex 1, Section<br />

1)<br />

Rf. 4000<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|233

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!