EIA for the proposed Hulhule-Male’ Bridge Project<br />

MNDF Coast Guard<br />

Date: 22 nd June 2015<br />

Time: 11:00 am<br />

Location: Ministry of Housing and Infrastructure<br />

Participants:<br />

1. Mohamed Ziyau- Warrant Officer-1<br />

Consultation meeting with the Coast Guard was held on 22 nd June 2015 at the Ministry of<br />

Housing and Infrastructure.<br />

The discussion with MNDF Coast Guard was centred on questions regarding the role of Coast<br />

Guard in diverting the marine traffic of Gaadhoo Koa. MNDF Coast Guard has not yet decided<br />

which vessels will be diverted. According to the Coast Guard officials, there will be no issues<br />

with the blockage of Gaadhoo Koa during the construction of the bridge, and Coast Guard is<br />

ready to provide all support needed. Coast Guard recommends more awareness to be carried<br />

regarding the channel blockage.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|293