29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Ministry of Youth and Sports<br />

Date: 2 nd July 2015<br />

Time: 13:00 pm<br />

Location: Phone Consultation<br />

Participants:<br />

1. Naif Shaukath, Deputy Minister<br />

Consultation with the deputy Minister, Mr. Naif Shaukath, of Ministry of Youth and Sports, was<br />

conducted on 2nd July 2015 over a phone conversation.<br />

The deputy minister was first briefed on the proposed project and the findings of the surveys that<br />

were conducted to get public opinion and concerns regarding the proposed project. He was also<br />

informed of the likely blocking of the lonuziyaraikolhu area including both parks and the surfing<br />

spot in the area during and after the construction stage of the proposed project.<br />

The main points discussed during the consultation include impacts to the recreational facilities<br />

surrounding the proposed project area and possible alternatives for these facilities.<br />

It was noted during the consultation that the ministry have not yet discussed the issue and nor<br />

considered any alternative locations. However, Mr. Naif pointed to some existing possible<br />

alternatives for the recreational facilities in the proposed project area.<br />

Deputy minister stressed that the biggest issue from the limited access to the project location will<br />

be to provide an alternative facility in Henveiru for the football players currently using Adi-park<br />

area. A possible alternative would be to build a new football ground somewhere in the artificial<br />

beach area.<br />

One alternative for people who exercise and jog around the proposed project area is to use the<br />

running track in Mahchangolhi as an alternative. However the minister also noted that the<br />

running track in Mahchangolhi is full most of the time.<br />

Alternatives mentioned for people who take their children to the playground in the proposed<br />

project location is to use Kudakudhinge Bageecha (children's park) in Henveiru.<br />

Deputy Minister also highlighted that Thulusdhoo, a close by island to Male’, has an excellent<br />

surfing spot and can be used by the surfers as an alternative location.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|275

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!