29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Table 9.2: Monitoring schedule for construction stage<br />

Monitoring<br />

Attribute<br />

Marine<br />

Water<br />

Quality<br />

(Marine)<br />

Ground<br />

Water<br />

Quality<br />

(ground<br />

water)<br />

Ambient air<br />

quality<br />

(Vehicles<br />

constructio<br />

n emissions)<br />

Marine<br />

Water<br />

Contaminat<br />

ion<br />

Indicator<br />

The following parameters will be<br />

tested:<br />

Temperature, Salinity, pH,<br />

Turbidity, Sedimentation rate,<br />

Total Suspended Solids, Nitrate,<br />

Phosphate, Sulfate,<br />

Hydrocarbons, , BOD, COD<br />

The following parameters will be<br />

tested:<br />

Temperature, Salinity, pH,<br />

Nitrate, Phosphate, Total<br />

Coliform, Faecal coliform,<br />

Hydrocarbons<br />

Solid particles: PM 10 , PM 2.5<br />

Gases: NO x , CO,<br />

SO2<br />

Oil spills<br />

(Surface layer of groundwater)<br />

Oil leakage from machinery or<br />

vessels<br />

Methodology<br />

Laboratory<br />

analysis<br />

Laboratory<br />

analysis<br />

Certified<br />

portable<br />

equipment<br />

Visual<br />

observation<br />

Maintenance and<br />

tuning of all<br />

machinery &<br />

vessels<br />

Locations &<br />

samples<br />

Surveys sites<br />

SW1 – SW12<br />

(See survey<br />

locations map)<br />

One from each<br />

site (Locations<br />

G1, G3, G4)<br />

Sites A1 , A2,<br />

A3<br />

corresponding<br />

to work sites<br />

All area where<br />

oil is handled<br />

All area where<br />

oil is handled<br />

Excavated<br />

areas<br />

Frequency<br />

Once every three months<br />

during construction<br />

Once every three months<br />

during construction<br />

Once every three months<br />

during construction<br />

Daily for the duration of the<br />

project<br />

Weekly during the<br />

construction phase<br />

Applicable<br />

standard<br />

WHO marine water<br />

quality standards<br />

Maldivian (EPA)<br />

ground water<br />

monitoring standards<br />

(See Appendix A,<br />

Annex 1, Section 1)<br />

USEPA standard<br />

NA<br />

NA<br />

Est. Total<br />

Costs RF 5<br />

Rf83,000<br />

Rf16,000<br />

Rf36,000<br />

Included in<br />

contractor<br />

fees<br />

Included in<br />

contractor<br />

fees<br />

5 Total construction and operations stage<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|234

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!