EIA for the proposed Hulhule-Male’ Bridge Project<br />

The traffic committee at MHI will coordinate with all relevant authorities both during<br />

construction and operation stages to manage the traffic at site. MHI has requested to include a<br />

separate lane for public transport.<br />

The accommodation for project staff is given from Hulhumale’ and cannot be provided in Male’<br />

because of the large number of envisaged construction staff. However, the contractor prefers<br />

accommodation from as close to the project site as is possible.<br />

The tsunami monument will be moved to a place in Male’ but location is not yet decided.<br />

Perhaps the tsunami monument will be placed at Majeedhee Magu end. The tsunami monument<br />

will not be moved to Vilufushi.<br />

The Maldives Transport Authority’s marine transport section will regulate marine traffic. The<br />

rerouting of ships will not be a problem once port is moved to Thilafushi. There is a need to<br />

discuss the clearance permit for small vessels in the plan. The coast guard vessel was the biggest<br />

vessels considered during planning stages.<br />

A specialist will be hired to run a unit at MHI to approve bridge design and to implement the<br />

project. The approvals for this project will be provided by MHI.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|270