EIA for the proposed Hulhule-Male’ Bridge Project<br />

7 ALTERNATIVES<br />

This chapter considers possible alternatives for relevant components of the project including the<br />

no project option.<br />

7.1 ‘No Project’ Alternative<br />

The “No Project” option takes the following into account.<br />

- “Male-Hulhule” bridge will not be built under this project.<br />

A comparative summary of the advantages and disadvantages of the proposed alternative is<br />

given below.<br />

Table 7.1: Comparative Summary of "No Project" alternative<br />

Advantages<br />

• The money earmarked for bridge<br />

development could perhaps be diverted<br />

to more immediate social needs in the<br />

Male’ region such as waste management,<br />

upgrading hospital or social housing.<br />

• The project can avoid becoming a<br />

potentially ‘white elephant’<br />

infrastructure assuming that the planned<br />

airport upgrade does not happen in time.<br />

• Further traffic congestion in Male’ can<br />

be avoided by preventing vehicles from<br />

Hulhumale’ crowding Male’ streets.<br />

• Traffic congestion in Hulhumale’ due to<br />

vehicles coming for ‘leisure drives’ in<br />

Hulhmale’ could be avoided.<br />

• Adverse environmental impacts related<br />

to bridge development can be avoided<br />

• Public unease about constructing on the<br />

Disadvantages<br />

• Loss of opportunity to boost economic<br />

activities in both Male’ and Hulhumale’<br />

through a physical link.<br />

• Loss of opportunity to provide a more<br />

reliable and convenient mode of transport<br />

for people living in Hulhumale’ and<br />

between Male’ and airport.<br />

• Reduced costs of transport for both<br />

public and commercial sector<br />

• Loss of new direct employment<br />

opportunities related to the bridge project<br />

and subsequent indirect employment<br />

opportunities associated with the<br />

mobility provided from the bridge.<br />

• Loss of direct and indirect economic<br />

benefits associated with the bridge<br />

development project<br />

• The government fails to deliver on a<br />

campaign promise which was believed to<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|195