EIA for the proposed Hulhule-Male’ Bridge Project<br />

• Command organization, contact and telephone number, etc.<br />

Depending on the nature of the accident, it is necessary to follow the principle of prioritizing the<br />

protection of personnel and the safety of the ship over the protection of the environment during<br />

an emergency response. It is important to quickly organize the evacuation of personnel from the<br />

area where the accident happened, guide other ships to safe areas and to provide rescue<br />

assistance as soon as it is safe and feasible to take emergency action. At the same time, if the<br />

ship or ships involved in the accident are believed to be a risk to other ships using the<br />

navigational channel or to the residents of the coastal dwellings close to the accident zone,<br />

guidance should be sought from the command centre and inform the traffic regulation authority<br />

to control or divert the traffic headed towards the accident zone.<br />

The emergency personnel should wear the appropriate protective garment and respirator when<br />

attending the accident. The specific traffic control command should be uniformly issued by the<br />

command center to the relevant authorities and the traffic channel should clear for the passage of<br />

the rescue ships and materials.<br />

In the case of an accident involving oil spill or leakage, organize the technical team to take quick<br />

and effective measures such as oils control, recycling or dispersion and the temporary storage<br />

and disposal of oils.<br />

6.11 Cost of Mitigation measures<br />

Best practices and ethics are the basis of the mitigation measures. All works of the project will<br />

be aligned with environmental ethics to ensure that there is minimal negative impact of the<br />

project on the environment. This includes properly timing the construction works for<br />

environmentally favourable times and using environmentally friendly materials as much as<br />

possible. These mitigation measures may not have direct costs but the reduction in available<br />

work hours and consideration of safety factors may lead to an increase of about 2-4% increase in<br />

project costs. Based on these estimates, the cost of mitigation is estimated between US$8-10<br />

million.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|194