EIA for the proposed Hulhule-Male’ Bridge Project<br />

The noise monitoring stations have been selected at receptor locations that are likely to be<br />

affected during construction and operational phases of the proposed project viz. due to operation<br />

of construction machineries and vehicular movement.<br />

1.8.3.4 Flora and Fauna<br />

Terrestrial flora of all three islands were surveyed by walking along the island following the line<br />

transect method. The types and abundance of species were recorded along the surveyed lines.<br />

Information on the occurrence of terrestrial fauna was obtained along the line transect.<br />

1.8.3.5 Marine Water Samples<br />

Water quality was assessed from MWSC laboratory. Water quality samples were taken at<br />

different locations selected based on proposed developments. Parameters measured include<br />

electrical conductivity, total dissolved solids (TDS), salinity, pH, temperature, Sulphate,<br />

Phosphate, Total Petroleum Hydrocarbon and biological oxygen demand (BoD). The laboratory<br />

uses methods prescribed in “Standard Methods for Examining Water and Wastewater”. Samples<br />

were collected in clean 1.5L PET bottles after washing them with the water to be sampled. Water<br />

samples were collected below 1 m from the surface. Biological samples were collected in<br />

sterilized 100 ml glass bottles provided by the MWSC Laboratory.<br />

1.8.3.6 Ground Water Samples<br />

Ground water samples were collected from three locations: Male’, Hulhule and Hulhumale’. In<br />

Male’ a well was dug to 1 m below water table and allowed to settle, before taking grab samples.<br />

In addition, water from the well at the nearest building – Marine Research Centre building – was<br />

also taken. Samples at Hulhule and Hulhumale’ were collected by digging a well 1 m below<br />

water level.<br />

Samples were collected in clean 1.5L PET bottles after washing them with the water to be<br />

sampled. Water samples were collected below 1 m from the surface. Biological samples were<br />

collected in sterilized 100 ml glass bottles provided by the Public Health Laboratory.<br />

1.8.4 Key Stakeholder Consultation<br />

During the EIA preparation for the bridge project, stakeholder consultations were conducted<br />

extensively. Stakeholder consultations were conducted between 15 th June and 5th July 2015. The<br />

following stakeholders were consulted for this EIA:<br />

1. Ministry of Housing and Infrastructure<br />

2. Hulhumale’ Development Corporation<br />

3. Male’ City Council<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|8