EIA for the proposed Hulhule-Male’ Bridge Project<br />

required at night time, contractor should ask for the opinions of the local<br />

municipal administrative authority.<br />

Strengthen the maintenance of construction equipment.<br />

Mechanical equipment should be placed in a firm and stable ground.<br />

The driving routes and schedules for the construction vehicles moving in<br />

and out of the site shall be reasonably arranged and their management<br />

should be strengthened. Contractors shall try and reduce movement of<br />

heavy vehicles during night time (22:00 to 06:00 hrs) during the<br />

construction period as much as possible.<br />

Air quality<br />

Hard enclosure walls not lower than 2 m high shall be set up around the<br />

construction area of the proposed project to prevent the impact of airborne<br />

dust in the construction site on the outside.<br />

Project proponent<br />

Continuous, during<br />

construction phase<br />

Optimize the layout plan of the construction site; i.e. the concrete<br />

mixing area where air-borne dust is easily produced, shall be located at<br />

the southeast side of the site, keeping it far away from residential area.<br />

During the construction phase, all earthwork activities such as the<br />

preparation of roadbeds, pipelines…etc. will be undertaken along with<br />

watering measures to prevent air-borne dust pollution.<br />

Vehicle washing facilities will be set up (including drainage facilities)<br />

along with mud sedimentation facilities at the construction site. All<br />

vehicles shall complete the wash, cover and clean process before leaving<br />

the construction site, to prevent excess materials, building rubble and<br />

mulch from scattering around in the vicinity.<br />

The access road used to transport materials and the access road to the<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|218