29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

流 速 (m/s)<br />

0.60<br />

0.50<br />

0.40<br />

0.30<br />

0.20<br />

0.10<br />

1#<br />

流 速<br />

流 向<br />

450<br />

400<br />

350<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

流 向 (°)<br />

0.00<br />

-50<br />

12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00<br />

时 间<br />

(b) Flow direction and mean flow speed in vertical direction<br />

Figure 4.9: Flow direction process of mean flow speed for layered and vertical line at 1 # survey point<br />

(a) Layered flowing vector<br />

0.80<br />

2#<br />

400<br />

流 速 (m/s)<br />

0.70<br />

0.60<br />

0.50<br />

0.40<br />

0.30<br />

0.20<br />

0.10<br />

流 速<br />

流 向<br />

350<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

流 向 (°)<br />

0.00<br />

0<br />

12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00<br />

时 间<br />

(b) Flow direction process for mean flow speed in vertical direction<br />

Figure 4.10: Flow direction process of mean flow speed for layered and vertical line at #2 survey point<br />

Prepared by: CDE Consulting & China Shipping Environment Technology Page| 66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!