29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- EIA report for the proposed installation and operation of desalination plant at Kudarikilu Island, Baa Atoll<br />

(January 2012)<br />

- Initial Environmental Examination (IEE) report for the proposed relocation of coconut palms from Laamu<br />

Hithadhoo to Six Senses Laamu (December 2011)<br />

- Marine environmental assessment and report for the EIA prepared for the proposed harbour development project in<br />

Noomara Island, Shaviyani Atoll (December 2011)<br />

- Initial Environmental Examination (IEE) report for the proposed relocation of coconut palms from Rasgetheem to<br />

Fushivelavaru Resort (November 2011)<br />

- Baseline environmental assessments and report for the EIA prepared for the development of domestic airport in<br />

Ga. Koodoo (September 2011)<br />

- Baseline environmental assessments and report for the proposed channel deepening, beach replenishment and<br />

erosion mitigation project at Maamigili Raa Atoll (August 2011)<br />

- Marine environmental assessments and report for the EIA prepared for the proposed reconstruction of AA.<br />

Bodufolhodhoo harbour (August 2011)<br />

- Baseline environmental assessments and report for the EIA prepared for the proposed redevelopment of<br />

Gasfinolhu Island Resort, EIA (July 2011)<br />

- Marine assessment report for the baseline environmental study for Thilafushi Solid Waste Management Facility<br />

(June 2011)<br />

- Marine environmental assessments and report for the EIA prepared for the proposed resort development at<br />

Giraavaru Island, Maldives (June 2011)<br />

- Baseline environmental assessments and report for the EIA prepared for the proposed Harbour reconstruction work<br />

in Foakaidhoo Island, Shaviyani Atoll (March 2011)<br />

- Co-ordinated the national Household Income and Expenditure Survey (Foreigners) (February 2011)<br />

- Marine environmental assessments and report for the EIA prepared for the proposed Resort development at<br />

Villivaru Island, Maldives (February 2011)<br />

- Carried out assessments to determine the baseline conditions of the reefs around Rahfalhu Huraa, Male’ Atoll for<br />

the EIA prepared for the proposed development of a picnic island at Rahfalhu Huraa, Male’ Atolll, Maldives<br />

(January 2011)<br />

- Carried out marine assessments to determine the condition of the marine environment of Herathera Island Resort,<br />

Addu Atoll for the EIA prepared for the removal of seagrass and beach replenishment activities in Herathera Island<br />

Resort, Addu Atoll, Maldives. (September 2010)<br />

- Certified PADI open water diver<br />

OTHER SKILLS<br />

2 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!