EIA for the proposed Hulhule-Male’ Bridge Project<br />

construction of main bridge foundation; the construction of steel trestle is proposed to be<br />

adopted underneath the approach bridge. Therefore, in the process of steel trestle construction,<br />

deposition of integral steel casing sinks and water pumping, the partial bottom sediment may be<br />

disturbed easily so as to cause the suspension of bottom sediment. Based on geotechnical<br />

investigations, the dominant substrate at type at this project site is rock, rubble and sand with<br />

larger grain diameter. Except in nearshore waters, the concentration of suspended matters to<br />

construction will be in the vicinity of bridge pier, mainly within a 5 m area. Therefore, the<br />

impact of bridge foundation on plankton during construction period will be minimal.<br />

In addition, during construction of the bridge, accidental oil spills to the surrounding sea from<br />

machinery and equipment on the construction platform, the residual oil leaking in the process of<br />

machinery maintenance and oil leaking from construction ship and machinery equipment may<br />

cause serious oil pollution and adversely impact plankton population. Construction management<br />

measures to prevent these as prescribed in this report shall be strictly adhered during the<br />

execution of the project.<br />

A sand borrow area is proposed in Gulhifalhu Island for this project. Dredging is likely to<br />

generate sediment plumes at this site, and increase the level of suspended solids in water<br />

column, reducing the overall water quality. However, it is expected to subside shortly after<br />

dredging work.<br />

6.3.1.2 Analysis for impact on benthos during construction period<br />

Benthic flora and fauna are an important biotype in the marine ecosystem, and the coral reefs are<br />

the most important benthos in the Maldivian context. Coral reefs are highly sensitive to<br />

environmental changes and pollution. Live corals and sessile benthic flora and fauna within the<br />

footprint of the bridge (especially those falling in the footprint of the piers) are likely to be lost,<br />

if no measures are taken to move these to other suitable locations. Sediment plumes generated<br />

during the construction, will also adversely affect the benthic life forms at this site.<br />

In addition, shading by the bridge deck will adversely impact benthos that are dependent on<br />

sunlight for energy (e.g. corals, and algae.), these can be fatal depending on the level of sunlight<br />

they receive throughout the day.<br />

In this project, No.1-10 pier foundation is 6.25 m×7.0 m; No.11-18 pier foundation is 6.25<br />

m×10.0 m; No.19-21 pier foundation is 17 m×23.25 m, No.22-23 pier foundation is 10.25<br />

m×23.25 m, No.24 pier foundation is 6.25 m×6.25 m and No.25-26 pier foundation is 6.25<br />

m×7.0 m. Through calculation, the habitat area of benthos affected by occupation of bridge pier<br />

foundation is about 2706 m 2 ,the land reclamation area for connecting subgrade on Airport<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|155