29.02.2016 Views

HULHULE-MALE’ BRIDGE PROJECT

QkZOny

QkZOny

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA for the proposed Hulhule-Male’ Bridge Project<br />

Marine Research Centre<br />

Date: 28 June 2015<br />

Time: 13:00 – 14:00<br />

Location: Marine Research Center (MRC)<br />

Participants:<br />

1. Dr. Mohamed Shiham Adam, Executive Director<br />

Consultation with MRC was conducted on 28th June 2014 at the Marine Research Center.<br />

At the beginning of the meetings a detailed description of the proposed bridge, the work sites,<br />

and the existing environment was given.<br />

Officials from MRC highlighted that there are no marine research done on the proposed area, so<br />

it was difficult to say the impact of the proposed project on the marine life in the area.<br />

The staff from MRC raised concerns regarding the possible increase in the number of vehicles in<br />

Male’ and how such traffic can be managed in the future.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />

Page|291

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!