EIA for the proposed Hulhule-Male’ Bridge Project<br />

add to burden on the visitors in terms of time and travel routes and other added difficulties<br />

associated with departures.<br />

Although guesthouse tourism in Hulhumale beach front is unplanned development, Tourism is<br />

planned development – those planned resorts around the airport developed as higher star rating<br />

at present might observe a decline in star rating, depending on the type of activity and movement<br />

around the airport.<br />

In the change of channel to Bodu Kalhi for transport, it should be considered that the frequent<br />

used Banana reef dive site falls in to the area. Hence it should be ensured that<br />

Safari vessels with masts and shipping liners might not be able to pass through the present<br />

channel Gaadhoo Koa channel and hence would need to be informed.<br />

Concerns/Issues:<br />

Concerns with regard to visitors arriving in Male’ at present include, lack of shelter at arrival<br />

point, toilet and support facilities for international visitors to add to convenience for the visitors.<br />

For the transfers from resorts in the south of Male’ that might face hiccups in the present route<br />

during construction and post contraction phase to not have to travel longer routes, especially<br />

during bad weather.<br />

There are several resort transfer vessels parked around the south west side of Male’ (towards the<br />

swimming track). Anchoring, birth, refueling sues. There may be a need to consider some form<br />

of diversion or easier access to the point.<br />

Victory Dive point is an important dive site for wreck dives and used for trainings as well. It is<br />

important to be able to get access to the dive site and to ensure that the wreck doesn’t get<br />

damaged during the construction of the bridge.<br />

The land next to Dharubaaruge is leased for tourism development. An advance payment of $7<br />

million had been made by the leaseholder. The leased land covers part of the road area in front<br />

of the park as well. It has to be ensured that the road extension or bridge and road use does not<br />

cross over to the boundary of the leased land for tourism development. Changing lease for such<br />

an investment would involve major financial compensations or reallocation of land from<br />

possibly by exchanging with uninhabited islands.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology<br />