EIA for the proposed Hulhule-Male’ Bridge Project<br />

using the temporary construction wharf. After the precasting I-type girder will transport to the<br />

construction site on barges for hoisting and splicing.<br />

Figure 2.10: Schematic Diagram for Plane Layout of Precast yard on Hulhumale Island<br />

2.3.3.2 Temporary construction site on Male’ side<br />

The construction site on Male side locates at “Adi park” or “Adu park” on the SE corner of<br />

Male’ (See Figure 2.11). A total of 5000 m 2 (60 × 83.3 m) will be allocated and will be mainly<br />

used for construction of land connection and approach bridge on Male' side. The plane layout<br />

covers concrete mixing area, reinforcement processing area, steel structure processing area,<br />

equipment parking area, materials storage area, office and living area and sewage treatment area,<br />

etc. Main equipment covers mixing station, power generator and transportation vehicle, etc. The<br />

construction site closes to Boduthakurufaanu Magu, the main materials and equipment all are<br />

transported via municipal road.<br />

Prepared by: CDE Consulting & China Shipping Environment Technology Page| 23