08.01.2017 Views

3e2a1b56-dafb-454d-87ad-86adea3e7b86

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

failures (continued)<br />

estimates of<br />

objective 578–82<br />

subjective 583<br />

likelihood 578–83<br />

mean time between (MTBF) 581–2,<br />

664<br />

mitigation 573, 592–3<br />

operations 39<br />

post-failure analyses 578<br />

potential occurrences 573<br />

prevention 75, 573, 586–92, 639, 642<br />

rates (FR) 578, 579–80, 661<br />

recovery from 593–43, 666<br />

business continuity 595–6<br />

environmental issues 639<br />

planning 573, 594–5<br />

quality and 502, 504<br />

social issues 642<br />

sources 573<br />

traceability 578<br />

farming 41–2, 328–30<br />

fashion industry 401–4<br />

fast-throughput operating see<br />

just-in-time<br />

fast fashion 401–4<br />

fast food 87<br />

fault tree analyses 578, 579, 661<br />

FCFS (first come first served) 282, 324<br />

feasibility, designs 120–1, 128, 660<br />

feedback 428, 461<br />

FIFO (first in first out) 282<br />

final design 117, 128–9<br />

finance functions 5–6, 18<br />

financial objectives 607<br />

financial performance 646–7<br />

financial returns 224–6<br />

finished goods inventory 345<br />

finite loading 278–9, 662<br />

Finney, S. 415–16<br />

first-tier customers 140–1, 377, 662<br />

first-tier suppliers first-tier see<br />

suppliers<br />

first come, first served (FCFS) 282, 324<br />

first in first out (FIFO) 282, 283<br />

Fisher, Marshall 391, 392<br />

fit, deviation from line of 605<br />

Fitzsimmons, J.A. 432<br />

five Ps of operations strategy formation<br />

78<br />

fixed cost breaks 155, 159–60, 662<br />

fixed costs 189<br />

fixed-position layouts see layouts<br />

flexi-time working 249, 662<br />

flexibility 662<br />

basic working practices 434<br />

capacity planning and control 301<br />

costs and 20, 47, 52, 53, 96<br />

dependability and 47, 48<br />

in-house supply 144<br />

inventory roles 342<br />

long-term 179<br />

low 243<br />

networks 212<br />

objectives 40, 46–8, 52, 53, 58, 69,<br />

89, 101<br />

outsourced supply 144<br />

performance measures 607–8<br />

process technology 223–2<br />

processes 443<br />

sandcone theory 616–17<br />

services 449<br />

supply chains 377<br />

see also mix flexibility; volume:<br />

flexibility<br />

flexible manufacturing systems (FMS)<br />

210, 662<br />

flexible working 249–51<br />

Flextronics 61–2<br />

float 470, 471, 477–9<br />

flows 177–8<br />

charts 559–60<br />

clarity of 179<br />

controlled, customers and materials<br />

201<br />

factory flow surgery 181<br />

length of 179<br />

process charts 99–100<br />

production flow analysis 194–6, 665<br />

rates 89<br />

record chart 190–1, 662<br />

shapes 438<br />

streamlined 436–40<br />

synchronized 431–2, 547, 550<br />

of transformed resources 187<br />

visibility 439<br />

volume-variety 187<br />

fluctuations, demand 301–4<br />

FMEA (failure mode and effect<br />

analysis) 541, 583–5, 661<br />

FMS (flexible manufacturing systems)<br />

210, 662<br />

focus groups 118, 171, 662<br />

food-processing industry 230–1<br />

forced labour 384<br />

Ford 379<br />

forecast demand 422<br />

forecasting 168–76, 301–4, 367<br />

Formule 1 hotels 14, 21<br />

forward-looking views, risk<br />

management 574<br />

forward passes 480<br />

forward scheduling 285–6, 662<br />

forward vertical integration 144<br />

Four Seasons Hotel 496–7<br />

four-stage model of operations<br />

contribution 63–4, 662<br />

FoxMeyer Drug 413<br />

FR (failure rates) 578, 579–80, 661<br />

freedom of association 384<br />

Freeman, Milton 646<br />

front-office environment 22, 662<br />

Fujitsu 145<br />

functional design organisation 133<br />

functional layouts see layouts<br />

functional purposes, grouping<br />

resources as 240<br />

functional strategies 66, 662<br />

functionality 502, 504<br />

functions<br />

basic 128<br />

core 4–6, 660<br />

manage all processes 17–18<br />

non-operations 18<br />

operations see operations<br />

operations as 18<br />

secondary 128<br />

support 5–6, 668<br />

G/G/m queues 336, 337–9<br />

GAM (Groupe As Maquilage) 530–2<br />

games 424–8<br />

Gantt charts 286–7, 475, 486, 662<br />

Gap 642–3<br />

gap-based approach 76<br />

garment industry 401–4<br />

Gate Gourmet 388<br />

GE 622<br />

Geneva Construction and Risk 565–8<br />

geo-social environments 463<br />

getting it right first time approach 513<br />

Giordano 68<br />

gliding club 80–1<br />

global alliances 410<br />

global sourcing 382–4, 400<br />

globalization 636, 641, 662<br />

goals<br />

perfection 547–8<br />

projects 461<br />

see also objectives; targets<br />

Goldratt, Eliyahu 290, 449<br />

goods see products; products/services<br />

Google 119, 237<br />

GORE-TEX® 234–5<br />

governments’ performance objectives<br />

38<br />

gravity analogy 290<br />

green reporting 640<br />

greenfield operations 76<br />

Greenpeace 583<br />

greetings cards 317<br />

Grohman, M.C. 176<br />

Groupe As Maquilage (GAM) 530–2<br />

growth stage, products/services 72<br />

Gummesson, E. 497<br />

H&M 401–4<br />

Hackman, J.R. 245<br />

hairdressers 122–3, 220<br />

Hall, Richard 441<br />

Hallmark Cards 317<br />

Hammer, Michael 550–1<br />

hand tools 203–4<br />

Happy Products 256–7<br />

Harrison, A. 452<br />

Hayes, R.H. 63–4, 95–6<br />

Index 675

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!