Organization <strong>of</strong> stamping plants<br />

batch size [pcs.]<br />

10,000<br />

8,000<br />

6,000<br />

4,000<br />

2,000<br />

6,400<br />

production cycle: ABCABD<br />

production cycle <strong>of</strong> 50 hours<br />

A<br />

9,000<br />

part cycle A<br />

6,200<br />

4,800<br />

B C A B D<br />

6 12 18 24 30 36 42 48 56<br />

part A: 7 p/min<br />

part B: 10 p/min<br />

part C: 8 p/min<br />

part A: 11 p/min<br />

inventory <strong>of</strong> finished parts<br />

in the intermediate storage<br />

for part A<br />

daily working hours:<br />

15 hours<br />

time [hours]<br />

10 min die change after each batch<br />

Fig. 4.9.5 Load schedule and parts inventory for production on a large-panel transfer <strong>press</strong><br />

time per part. Die changes and setting <strong>of</strong> new dies takes place within<br />

<strong>press</strong> stops between production, whereby the die changing time plays<br />

an important role (cf. Sect. 3.4).<br />

Production must be resumed once the storage drops to the defined<br />

safety inventory level, generally one day’s production. If we take type A,<br />

for example, this level would be reached at 6,200 pieces, while for type<br />

B the corresponding figure is 2,800 pieces. The 5,000 or 3,000 parts produced,<br />

less the parts used during manufacture, must last until the next<br />

planned production period – around 14 resp. 22 hours later. When compiling<br />

the load schedule, a fine balance must be drawn: On the one hand<br />

the production period for a batch size has to guarantee sufficient time<br />

for set-up <strong>of</strong> the die set for the next part. At the same time, however,<br />

excessively large batch sizes violate the principle <strong>of</strong> just-in-time production<br />

in terms <strong>of</strong> capital costs for work-in-process and costs for intermediate<br />

storage <strong>of</strong> finished parts.<br />

8,800<br />

Metal Forming Handbook / Schuler (c) Springer-Verlag Berlin Heidelberg 1998<br />

6,400<br />

3,300<br />

397<br />