29.12.2012 Views

3 Fundamentals of press design

3 Fundamentals of press design

3 Fundamentals of press design

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Organization <strong>of</strong> stamping plants<br />

Table 4.9.3: Production data for crossbar and tri-axis transfer <strong>press</strong>es<br />

Production cycle: 3 days<br />

Availability: 70%<br />

Die change time (min): 10<br />

Crossbar transfer <strong>press</strong><br />

Die sets:<br />

Planned utilization rate:<br />

16 (24)<br />

80%<br />

Part name<br />

Parts/<br />

stroke<br />

Part requirement/day<br />

Strokes/<br />

parts/cycle<br />

Part batch<br />

size<br />

body side, outer, right 1 450 1350 1350<br />

body side, outer, left 1 450 1350 1350<br />

door, outer, front, right + left 2 450 1350 2700<br />

trunk lid, inner 1 450 1350 1350<br />

ro<strong>of</strong> 1 450 1350 1350<br />

trunk lid, outer 1 450 1350 1350<br />

door, inner, front, right + left 2 450 1350 2700<br />

body side, inner, rear, right + left 2 450 1350 2700<br />

door, outer, rear, right + left 2 450 1350 2700<br />

door, inner, rear,right + left 2 450 1350 2700<br />

hood, outer 1 450 1350 1350<br />

hood, inner 1 450 1350 1350<br />

fender, outer, front, right + left 2 450 1350 2700<br />

wheel house, inner, front, right + left 2 450 1350 2700<br />

floor, mid 1 450 1350 1350<br />

floor, front 2 450 1350 2700<br />

Tri-axis transfer <strong>press</strong><br />

Production cycle: 3 days<br />

Availability: 70%<br />

Die change time (min): 10<br />

Die sets: 20<br />

Planned utilization rate: 80%<br />

Part name<br />

Parts/<br />

Stroke<br />

Part requirement/day<br />

Strokes/<br />

parts/cycle<br />

Part batch<br />

size<br />

floor, rear 1 450 1350 1350<br />

lock reinforcement, front, right 1 450 1350 1350<br />

lock reinforcement, rear, right 1 450 1350 1350<br />

rib, reinforcement, rear, right 1 450 1350 1350<br />

hinge pillar, front, right 1 450 1350 1350<br />

hinge reinforcement, front, right 1 450 1350 1350<br />

rib, reinforcement, front, right 1 450 1350 1350<br />

lock reinforcement, front, left 1 450 1350 1350<br />

lock reinforcement, rear, left 1 450 1350 1350<br />

rib, reinforcement, rear, left 1 450 1350 1350<br />

hinge pillar, front, left 1 450 1350 1350<br />

hinge reinforcement, front, left 1 450 1350 1350<br />

rib, reinforcement, front, left 1 450 1350 1350<br />

dash panel 1 450 1350 1350<br />

shelf, rear 1 450 1350 1350<br />

seat, reinforcement, rear 1 450 1350 1350<br />

wheel house inner, rear, left 1 450 1350 1350<br />

wheel house inner, rear, right 1 450 1350 1350<br />

sunro<strong>of</strong> 1 450 1350 1350<br />

sunro<strong>of</strong> aperture panel 1 450 1350 1350<br />

Metal Forming Handbook / Schuler (c) Springer-Verlag Berlin Heidelberg 1998<br />

399

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!