10.02.2013 Views

Bulletin 2011/10 - European Patent Office

Bulletin 2011/10 - European Patent Office

Bulletin 2011/10 - European Patent Office

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

II.5<br />

(11) 1 381 126 (51) H01T 4/12<br />

(84) FI 25.08.20<strong>10</strong> (84) PT 27.12.20<strong>10</strong><br />

SI 25.08.20<strong>10</strong><br />

(11) 1 381 213 (51) H04N 1/00<br />

(84) AT 09.06.20<strong>10</strong> (84) CY 09.06.20<strong>10</strong><br />

CZ 09.06.20<strong>10</strong> EE 09.06.20<strong>10</strong><br />

FI 09.06.20<strong>10</strong> GR <strong>10</strong>.09.20<strong>10</strong><br />

NL 09.06.20<strong>10</strong> PT 11.<strong>10</strong>.20<strong>10</strong><br />

RO 09.06.20<strong>10</strong> SE 09.06.20<strong>10</strong><br />

SI 09.06.20<strong>10</strong> SK 09.06.20<strong>10</strong><br />

(11) 1 381 339 (51) A61F 13/00<br />

(84) BE 29.04.2009 (84) CH 31.03.20<strong>10</strong><br />

FR 31.03.20<strong>10</strong> LI 31.03.20<strong>10</strong><br />

MC 31.03.20<strong>10</strong> SE 29.07.2009<br />

(11) 1 381 341 (51) A61G 7/015<br />

(84) AT 06.01.20<strong>10</strong> (84) BE 06.01.20<strong>10</strong><br />

CH 30.04.20<strong>10</strong> CY 06.01.20<strong>10</strong><br />

DK 06.01.20<strong>10</strong> ES 17.04.20<strong>10</strong><br />

FI 06.01.20<strong>10</strong> GR 07.04.20<strong>10</strong><br />

IE 19.04.20<strong>10</strong> LI 30.04.20<strong>10</strong><br />

MC 30.04.20<strong>10</strong> NL 06.01.20<strong>10</strong><br />

PT 06.05.20<strong>10</strong> SE 06.01.20<strong>10</strong><br />

(11) 1 381 436 (51) A63H 30/00<br />

(84) AT 29.07.2009 (84) BE 29.07.2009<br />

CH 30.04.20<strong>10</strong> DK 29.07.2009<br />

ES 09.11.2009 FI 29.07.2009<br />

GR 30.<strong>10</strong>.2009 IE 01.04.20<strong>10</strong><br />

LI 30.04.20<strong>10</strong> MC 30.04.20<strong>10</strong><br />

NL 29.07.2009 PT 29.11.2009<br />

SE 29.07.2009<br />

(11) 1 381 471 (51) B05B 15/12<br />

(84) AT 01.09.20<strong>10</strong> (84) FI 01.09.20<strong>10</strong><br />

(11) 1 381 476 (51) D21H 27/14<br />

(84) AT 17.03.20<strong>10</strong> (84) BE 17.03.20<strong>10</strong><br />

CH 30.04.20<strong>10</strong> CY 17.03.20<strong>10</strong><br />

DK 17.03.20<strong>10</strong> FI 17.03.20<strong>10</strong><br />

GR 18.06.20<strong>10</strong> IE 05.04.20<strong>10</strong><br />

LI 30.04.20<strong>10</strong> MC 30.04.20<strong>10</strong><br />

NL 17.03.20<strong>10</strong><br />

(11) 1 381 552 (51) B65H 19/<strong>10</strong><br />

(84) AT 26.03.2009 (84) BE 31.03.2009<br />

CH 09.04.2008 CY 09.04.2008<br />

DK 09.04.2008 FI 26.03.2009<br />

GR <strong>10</strong>.07.2008 IE 09.04.2008<br />

LI 09.04.2008 MC 31.03.2009<br />

NL 09.04.2008 PT 09.09.2008<br />

(11) 1 381 567 (51) C01F 7/00<br />

(84) AT 18.04.20<strong>10</strong> (84) PT 18.<strong>10</strong>.20<strong>10</strong><br />

LI 30.04.20<strong>10</strong> CH 30.04.20<strong>10</strong><br />

DK 14.05.2008 FI 14.05.2008<br />

GR 15.08.2008 IE 14.05.2008<br />

MC 30.04.2009 SE 14.08.2008<br />

(11) 1 381 587 (51) C07C 69/22<br />

(84) AT 11.11.2009 (84) BE 11.11.2009<br />

CH 31.03.20<strong>10</strong> CY 11.11.2009<br />

DK 11.11.2009 ES 22.02.20<strong>10</strong><br />

FI 11.11.2009 GR 12.02.20<strong>10</strong><br />

IE 22.03.20<strong>10</strong> LI 31.03.20<strong>10</strong><br />

MC 31.03.20<strong>10</strong> PT 11.03.20<strong>10</strong><br />

SE 11.11.2009<br />

(11) 1 381 850 (51) G01N 21/85<br />

(84) LI 30.04.20<strong>10</strong> (84) CH 30.04.20<strong>10</strong><br />

Europäisches <strong>Patent</strong>blatt<br />

<strong>European</strong> <strong>Patent</strong> <strong>Bulletin</strong><br />

<strong>Bulletin</strong> européen des brevets<br />

CY 23.12.2009 ES 03.04.20<strong>10</strong><br />

FI 23.12.2009 GR 24.03.20<strong>10</strong><br />

IE 23.12.2009 MC 30.04.20<strong>10</strong><br />

NL 23.12.2009 PT 23.04.20<strong>10</strong><br />

(11) 1 381 861 (51) G01N 33/53<br />

(84) AT 20.01.20<strong>10</strong> (84) BE 20.01.20<strong>10</strong><br />

CH 31.03.20<strong>10</strong> CY 20.01.20<strong>10</strong><br />

DK 20.01.20<strong>10</strong> ES 01.05.20<strong>10</strong><br />

FI 20.01.20<strong>10</strong> FR 31.03.20<strong>10</strong><br />

GR 21.04.20<strong>10</strong> IE 20.03.20<strong>10</strong><br />

LI 31.03.20<strong>10</strong> MC 31.03.20<strong>10</strong><br />

NL 20.01.20<strong>10</strong> PT 20.05.20<strong>10</strong><br />

SE 20.01.20<strong>10</strong><br />

(11) 1 381 908 (51) G02C 7/00<br />

(84) AT 25.08.20<strong>10</strong> (84) FI 25.08.20<strong>10</strong><br />

PT 27.12.20<strong>10</strong><br />

(11) 1 382 112 (51) H03F 1/32<br />

(84) AT 30.12.2009 (84) BE 30.12.2009<br />

CH 30.04.20<strong>10</strong> CY 30.12.2009<br />

DK 30.12.2009 ES <strong>10</strong>.04.20<strong>10</strong><br />

FI 30.12.2009 GR 31.03.20<strong>10</strong><br />

IE 25.04.20<strong>10</strong> LI 30.04.20<strong>10</strong><br />

MC 30.04.20<strong>10</strong> NL 30.12.2009<br />

PT 30.04.20<strong>10</strong> SE 30.12.2009<br />

(11) 1 382 234 (51) H05K 7/20<br />

(84) AT 07.04.20<strong>10</strong> (84) CH 30.04.20<strong>10</strong><br />

CY 14.04.20<strong>10</strong> DK 07.04.20<strong>10</strong><br />

FI 07.04.20<strong>10</strong> GR 08.07.20<strong>10</strong><br />

IE 22.04.20<strong>10</strong> LI 30.04.20<strong>10</strong><br />

MC 30.04.20<strong>10</strong> NL 07.04.20<strong>10</strong><br />

PT 09.08.20<strong>10</strong> SE 07.04.20<strong>10</strong><br />

(11) 1 382 336 (51) A61K 31/4439<br />

(84) AT 08.09.20<strong>10</strong> (84) FI 08.09.20<strong>10</strong><br />

(11) 1 382 782 (51) E05C 9/24<br />

(84) RO 23.06.20<strong>10</strong> (84) CZ 23.06.20<strong>10</strong><br />

EE 23.06.20<strong>10</strong> FI 23.06.20<strong>10</strong><br />

GR 24.09.20<strong>10</strong> NL 23.06.20<strong>10</strong><br />

PT 25.<strong>10</strong>.20<strong>10</strong> SE 23.06.20<strong>10</strong><br />

SI 23.06.20<strong>10</strong> SK 23.06.20<strong>10</strong><br />

(11) 1 382 809 (51) F01M 13/04<br />

(84) FI 15.09.20<strong>10</strong> (84) SI 15.09.20<strong>10</strong><br />

(11) 1 382 829 (51) F02F 7/00<br />

(84) FI 16.06.20<strong>10</strong><br />

(11) 1 382 908 (51) F23N 1/00<br />

(84) FI 29.09.20<strong>10</strong> (84) SI 29.09.20<strong>10</strong><br />

(11) 1 382 913 (51) F24C 15/00<br />

(84) FI 25.08.20<strong>10</strong> (84) PT 27.12.20<strong>10</strong><br />

SI 25.08.20<strong>10</strong><br />

(11) 1 383 015 (51) G04G 9/00<br />

(84) AT 07.04.20<strong>10</strong> (84) CY 14.04.20<strong>10</strong><br />

CZ 07.04.20<strong>10</strong> DK 07.04.20<strong>10</strong><br />

EE 07.04.20<strong>10</strong> ES 18.07.20<strong>10</strong><br />

FI 07.04.20<strong>10</strong> GR 08.07.20<strong>10</strong><br />

IE 07.04.20<strong>10</strong> NL 07.04.20<strong>10</strong><br />

PT 09.08.20<strong>10</strong> RO 07.04.20<strong>10</strong><br />

SE 07.04.20<strong>10</strong> SI 07.04.20<strong>10</strong><br />

SK 07.04.20<strong>10</strong><br />

(11) 1 383 <strong>10</strong>2 (51) G09G 3/28<br />

(84) AT 02.06.20<strong>10</strong> (84) CY 02.06.20<strong>10</strong><br />

CZ 02.06.20<strong>10</strong> EE 02.06.20<strong>10</strong><br />

FI 02.06.20<strong>10</strong> GR 03.09.20<strong>10</strong><br />

741<br />

<strong>Patent</strong>e<br />

<strong>Patent</strong>s<br />

Brevets (<strong>10</strong>/<strong>2011</strong>) 09.03.<strong>2011</strong><br />

PT 04.<strong>10</strong>.20<strong>10</strong> RO 02.06.20<strong>10</strong><br />

SE 02.06.20<strong>10</strong> SI 02.06.20<strong>10</strong><br />

SK 02.06.20<strong>10</strong><br />

(11) 1 383 411 (51) A47K <strong>10</strong>/42<br />

(84) AT 28.07.20<strong>10</strong> (84) FI 28.07.20<strong>10</strong><br />

PT 29.11.20<strong>10</strong><br />

(11) 1 383 558 (51) A61M 5/142<br />

(84) AT 08.07.2009 (84) BE 08.07.2009<br />

CH 31.03.20<strong>10</strong> DK 08.07.2009<br />

FI 08.07.2009 GR 09.<strong>10</strong>.2009<br />

IE 11.03.20<strong>10</strong> LI 31.03.20<strong>10</strong><br />

MC 31.03.20<strong>10</strong> NL 08.07.2009<br />

PT 09.11.2009<br />

(11) 1 383 623 (51) B23G 5/06<br />

(84) AT 25.11.2009 (84) BE 25.11.2009<br />

CH 30.04.20<strong>10</strong> CY 25.11.2009<br />

DK 25.11.2009 ES 08.03.20<strong>10</strong><br />

FI 25.11.2009 GR 26.02.20<strong>10</strong><br />

IE 29.04.20<strong>10</strong> LI 30.04.20<strong>10</strong><br />

MC 30.04.20<strong>10</strong> NL 25.11.2009<br />

PT 25.03.20<strong>10</strong> SE 25.11.2009<br />

(11) 1 383 625 (51) B23K 1/00<br />

(84) AT 08.09.20<strong>10</strong> (84) FI 08.09.20<strong>10</strong><br />

(11) 1 383 811 (51) C08F 214/18<br />

(84) AT 25.11.2009 (84) BE 25.11.2009<br />

CH 30.04.20<strong>10</strong> CY 25.11.2009<br />

DK 25.11.2009 ES 08.03.20<strong>10</strong><br />

FI 25.11.2009 GR 26.02.20<strong>10</strong><br />

LI 30.04.20<strong>10</strong> MC 30.04.20<strong>10</strong><br />

PT 25.03.20<strong>10</strong> SE 25.11.2009<br />

(11) 1 383 919 (51) C12Q 1/68<br />

(84) FI 07.07.20<strong>10</strong> (84) PT 08.11.20<strong>10</strong><br />

(11) 1 383 920 (51) G01N 33/532<br />

(84) AT 29.09.20<strong>10</strong> (84) FI 29.09.20<strong>10</strong><br />

(11) 1 383 924 (51) C12Q 1/68<br />

(84) AT <strong>10</strong>.02.20<strong>10</strong> (84) BE <strong>10</strong>.02.20<strong>10</strong><br />

CH 30.04.20<strong>10</strong> CY <strong>10</strong>.02.20<strong>10</strong><br />

DK <strong>10</strong>.02.20<strong>10</strong> ES 21.05.20<strong>10</strong><br />

FI <strong>10</strong>.02.20<strong>10</strong> GR 11.05.20<strong>10</strong><br />

IE 02.04.20<strong>10</strong> LI 30.04.20<strong>10</strong><br />

MC 30.04.20<strong>10</strong> NL <strong>10</strong>.02.20<strong>10</strong><br />

PT 11.06.20<strong>10</strong> SE <strong>10</strong>.02.20<strong>10</strong><br />

(11) 1 383 927 (51) C12Q 1/68<br />

(84) AT 08.07.2009 (84) BE 08.07.2009<br />

CH 31.03.20<strong>10</strong> DK 08.07.2009<br />

ES 19.<strong>10</strong>.2009 FI 08.07.2009<br />

FR 31.03.20<strong>10</strong> GR 09.<strong>10</strong>.2009<br />

IE 29.03.20<strong>10</strong> LI 31.03.20<strong>10</strong><br />

MC 31.03.20<strong>10</strong> PT 09.11.2009<br />

(11) 1 383 934 (51) C22B 3/00<br />

(84) CH 30.04.20<strong>10</strong> (84) CY 26.08.2009<br />

DK 26.08.2009 ES 07.12.2009<br />

FI 26.08.2009 GR 27.11.2009<br />

IE 26.08.2009 LI 30.04.20<strong>10</strong><br />

MC 30.04.20<strong>10</strong> NL 26.08.2009<br />

PT 28.12.2009 SE 26.08.2009<br />

(11) 1 383 954 (51) D06P 5/00<br />

(84) AT 03.03.20<strong>10</strong> (84) BE 03.03.20<strong>10</strong><br />

CH 31.03.20<strong>10</strong> CY 03.03.20<strong>10</strong><br />

DK 03.03.20<strong>10</strong> ES 14.06.20<strong>10</strong><br />

FI 03.03.20<strong>10</strong> GR 04.06.20<strong>10</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!