10.02.2013 Views

Bulletin 2011/10 - European Patent Office

Bulletin 2011/10 - European Patent Office

Bulletin 2011/10 - European Patent Office

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

II.5<br />

NL 21.07.20<strong>10</strong> SI 21.07.20<strong>10</strong><br />

(11) 1 518 082 (51) F28D 1/02<br />

(84) CY 11.11.2009 (84) DK 11.11.2009<br />

FI 26.06.20<strong>10</strong> GR 12.02.20<strong>10</strong><br />

MC 30.06.20<strong>10</strong><br />

(11) 1 518 133 (51) G01S 17/93<br />

(84) SI 06.<strong>10</strong>.20<strong>10</strong><br />

(11) 1 518 282 (51) H01M 2/00<br />

(84) FI 08.09.20<strong>10</strong> (84) SI 08.09.20<strong>10</strong><br />

(11) 1 518 284 (51) H01M 4/58<br />

(84) AT 25.08.20<strong>10</strong> (84) PT 27.12.20<strong>10</strong><br />

FI 25.08.20<strong>10</strong> SI 25.08.20<strong>10</strong><br />

(11) 1 518 292 (51) H01M <strong>10</strong>/14<br />

(84) AT 12.05.20<strong>10</strong> (84) CY 12.05.20<strong>10</strong><br />

CZ 12.05.20<strong>10</strong> DK 12.05.20<strong>10</strong><br />

EE 12.05.20<strong>10</strong> ES 23.08.20<strong>10</strong><br />

FI 12.05.20<strong>10</strong> GR 13.08.20<strong>10</strong><br />

MC 30.06.20<strong>10</strong> NL 12.05.20<strong>10</strong><br />

PT 13.09.20<strong>10</strong> RO 12.05.20<strong>10</strong><br />

SE 12.05.20<strong>10</strong> SI 12.05.20<strong>10</strong><br />

SK 12.05.20<strong>10</strong><br />

(11) 1 518 303 (51) H01R 43/02<br />

(84) AT 30.06.2008 (84) BE 30.06.2008<br />

BG 19.06.2008 CH 19.03.2008<br />

CY 19.03.2008 CZ 30.06.20<strong>10</strong><br />

DK 19.03.2008 EE 19.03.2008<br />

FI 19.03.2008 GB 30.06.2008<br />

GR 20.06.2008 HU 20.09.2008<br />

IE 19.03.2008 LI 19.03.2008<br />

LU 30.06.2008 MC 30.06.2008<br />

NL 19.03.2008 SE 19.06.2008<br />

SI 19.03.2008<br />

(11) 1 518 3<strong>10</strong> (51) H02H 3/33<br />

(84) AT 26.05.20<strong>10</strong> (84) CY 26.05.20<strong>10</strong><br />

CZ 26.05.20<strong>10</strong> EE 26.05.20<strong>10</strong><br />

GR 27.08.20<strong>10</strong> NL 26.05.20<strong>10</strong><br />

PT 27.09.20<strong>10</strong> RO 26.05.20<strong>10</strong><br />

SI 26.05.20<strong>10</strong> SK 26.05.20<strong>10</strong><br />

(11) 1 518 322 (51) H03F 3/16<br />

(84) AT 03.03.20<strong>10</strong> (84) BE 03.03.20<strong>10</strong><br />

BG 03.06.20<strong>10</strong> CH 30.04.20<strong>10</strong><br />

CY 03.03.20<strong>10</strong> CZ 03.03.20<strong>10</strong><br />

DK 03.03.20<strong>10</strong> EE 03.03.20<strong>10</strong><br />

ES 14.06.20<strong>10</strong> FI 03.03.20<strong>10</strong><br />

GR 04.06.20<strong>10</strong> IE 28.04.20<strong>10</strong><br />

LI 30.04.20<strong>10</strong> MC 30.04.20<strong>10</strong><br />

NL 03.03.20<strong>10</strong> PT 05.07.20<strong>10</strong><br />

RO 03.03.20<strong>10</strong> SE 03.03.20<strong>10</strong><br />

SI 03.03.20<strong>10</strong> SK 03.03.20<strong>10</strong><br />

(11) 1 518 342 (51) H04B 17/00<br />

(84) AT 15.09.20<strong>10</strong> (84) FI 15.09.20<strong>10</strong><br />

SI 15.09.20<strong>10</strong><br />

(11) 1 518 407 (51) H04N 7/173<br />

(84) AT 14.04.20<strong>10</strong> (84) CY 21.04.20<strong>10</strong><br />

CZ 14.04.20<strong>10</strong> DK 14.04.20<strong>10</strong><br />

EE 14.04.20<strong>10</strong> FI 14.04.20<strong>10</strong><br />

GR 15.07.20<strong>10</strong> MC 30.06.20<strong>10</strong><br />

NL 14.04.20<strong>10</strong> PT 16.08.20<strong>10</strong><br />

RO 14.04.20<strong>10</strong> SE 14.04.20<strong>10</strong><br />

SI 14.04.20<strong>10</strong> SK 14.04.20<strong>10</strong><br />

Europäisches <strong>Patent</strong>blatt<br />

<strong>European</strong> <strong>Patent</strong> <strong>Bulletin</strong><br />

<strong>Bulletin</strong> européen des brevets<br />

(11) 1 518 436 (51) H04W 4/06<br />

(84) AT 15.09.20<strong>10</strong> (84) FI 15.09.20<strong>10</strong><br />

SI 15.09.20<strong>10</strong><br />

(11) 1 518 534 (51) A61K 8/81<br />

(84) AT 14.07.20<strong>10</strong> (84) PT 15.11.20<strong>10</strong><br />

FI 14.07.20<strong>10</strong> NL 14.07.20<strong>10</strong><br />

PL 14.07.20<strong>10</strong> SI 14.07.20<strong>10</strong><br />

(11) 1 518 624 (51) B23B 31/02<br />

(84) FI 08.09.20<strong>10</strong><br />

(11) 1 518 691 (51) B41J 2/175<br />

(84) AT 23.06.20<strong>10</strong> (84) CZ 23.06.20<strong>10</strong><br />

EE 23.06.20<strong>10</strong> FI 23.06.20<strong>10</strong><br />

GR 24.09.20<strong>10</strong> NL 23.06.20<strong>10</strong><br />

PL 23.06.20<strong>10</strong> PT 25.<strong>10</strong>.20<strong>10</strong><br />

RO 23.06.20<strong>10</strong> SE 23.06.20<strong>10</strong><br />

SI 23.06.20<strong>10</strong> SK 23.06.20<strong>10</strong><br />

(11) 1 518 697 (51) B41J 3/407<br />

(84) AT 14.04.20<strong>10</strong> (84) CY 21.04.20<strong>10</strong><br />

CZ 14.04.20<strong>10</strong> DK 14.04.20<strong>10</strong><br />

EE 14.04.20<strong>10</strong> ES 25.07.20<strong>10</strong><br />

FI 14.04.20<strong>10</strong> GR 15.07.20<strong>10</strong><br />

NL 14.04.20<strong>10</strong> PL 14.04.20<strong>10</strong><br />

PT 16.08.20<strong>10</strong> RO 14.04.20<strong>10</strong><br />

SE 14.04.20<strong>10</strong> SI 14.04.20<strong>10</strong><br />

SK 14.04.20<strong>10</strong><br />

(11) 1 518 816 (51) B66B 23/24<br />

(84) CY 21.04.20<strong>10</strong> (84) DK 07.04.20<strong>10</strong><br />

EE 07.04.20<strong>10</strong> FI 07.04.20<strong>10</strong><br />

GR 08.07.20<strong>10</strong> IE 07.04.20<strong>10</strong><br />

NL 07.04.20<strong>10</strong> PL 07.04.20<strong>10</strong><br />

PT 09.08.20<strong>10</strong> RO 07.04.20<strong>10</strong><br />

SE 07.04.20<strong>10</strong> SI 07.04.20<strong>10</strong><br />

(11) 1 518 918 (51) C<strong>10</strong>L 1/14<br />

(84) AT 07.07.20<strong>10</strong> (84) PL 07.07.20<strong>10</strong><br />

FI 07.07.20<strong>10</strong> NL 07.07.20<strong>10</strong><br />

SI 07.07.20<strong>10</strong><br />

(11) 1 519 138 (51) G01B 5/012<br />

(84) PL 28.07.20<strong>10</strong> (84) FI 28.07.20<strong>10</strong><br />

NL 28.07.20<strong>10</strong> PT 29.11.20<strong>10</strong><br />

SI 28.07.20<strong>10</strong><br />

(11) 1 519 158 (51) G01D 5/26<br />

(84) PL 11.08.20<strong>10</strong> (84) FI 11.08.20<strong>10</strong><br />

NL 11.08.20<strong>10</strong> PT 13.12.20<strong>10</strong><br />

SI 11.08.20<strong>10</strong><br />

(11) 1 519 201 (51) H04W 64/00<br />

(84) AT 22.09.20<strong>10</strong> (84) FI 22.09.20<strong>10</strong><br />

(11) 1 519 301 (51) G06K 9/00<br />

(84) FI 08.09.20<strong>10</strong> (84) PL 08.09.20<strong>10</strong><br />

SI 08.09.20<strong>10</strong><br />

(11) 1 519 304 (51) G06K 15/00<br />

(84) AT 25.08.20<strong>10</strong> (84) PL 25.08.20<strong>10</strong><br />

FI 25.08.20<strong>10</strong> PT 27.12.20<strong>10</strong><br />

SI 25.08.20<strong>10</strong><br />

(11) 1 519 545 (51) H04M 1/02<br />

(84) AT 11.08.20<strong>10</strong> (84) PL 11.08.20<strong>10</strong><br />

FI 11.08.20<strong>10</strong> NL 11.08.20<strong>10</strong><br />

PT 13.12.20<strong>10</strong> SI 11.08.20<strong>10</strong><br />

(11) 1 519 625 (51) H04R 25/00<br />

(84) AT 12.05.20<strong>10</strong> (84) CY 12.05.20<strong>10</strong><br />

CZ 12.05.20<strong>10</strong> EE 12.05.20<strong>10</strong><br />

816<br />

<strong>Patent</strong>e<br />

<strong>Patent</strong>s<br />

Brevets (<strong>10</strong>/<strong>2011</strong>) 09.03.<strong>2011</strong><br />

ES 23.08.20<strong>10</strong> FI 12.05.20<strong>10</strong><br />

GR 13.08.20<strong>10</strong> NL 12.05.20<strong>10</strong><br />

PL 12.05.20<strong>10</strong> PT 13.09.20<strong>10</strong><br />

RO 12.05.20<strong>10</strong> SE 12.05.20<strong>10</strong><br />

SI 12.05.20<strong>10</strong> SK 12.05.20<strong>10</strong><br />

(11) 1 519 659 (51) A41D 13/015<br />

(84) CY 21.04.20<strong>10</strong> (84) CZ 07.04.20<strong>10</strong><br />

DK 07.04.20<strong>10</strong> EE 07.04.20<strong>10</strong><br />

ES 18.07.20<strong>10</strong> FI 07.04.20<strong>10</strong><br />

GR 08.07.20<strong>10</strong> IE 07.04.20<strong>10</strong><br />

NL 07.04.20<strong>10</strong> PT 09.08.20<strong>10</strong><br />

RO 07.04.20<strong>10</strong> SE 07.04.20<strong>10</strong><br />

SI 07.04.20<strong>10</strong> SK 07.04.20<strong>10</strong><br />

(11) 1 519 693 (51) A61C 8/00<br />

(84) AT 07.04.20<strong>10</strong> (84) CY 21.04.20<strong>10</strong><br />

CZ 07.04.20<strong>10</strong> DK 07.04.20<strong>10</strong><br />

EE 07.04.20<strong>10</strong> ES 18.07.20<strong>10</strong><br />

FI 07.04.20<strong>10</strong> GR 08.07.20<strong>10</strong><br />

MC 30.06.20<strong>10</strong> NL 07.04.20<strong>10</strong><br />

PT 09.08.20<strong>10</strong> RO 07.04.20<strong>10</strong><br />

SI 07.04.20<strong>10</strong> SK 07.04.20<strong>10</strong><br />

(11) 1 519 713 (51) A61K 9/00<br />

(84) FI 15.09.20<strong>10</strong> (84) SI 15.09.20<strong>10</strong><br />

(11) 1 519 717 (51) A61K 9/50<br />

(84) AT 29.09.20<strong>10</strong> (84) SI 29.09.20<strong>10</strong><br />

(11) 1 519 771 (51) A61N 5/06<br />

(84) AT 19.05.20<strong>10</strong> (84) CY 19.05.20<strong>10</strong><br />

CZ 19.05.20<strong>10</strong> EE 19.05.20<strong>10</strong><br />

FI 19.05.20<strong>10</strong> GR 20.08.20<strong>10</strong><br />

MC 31.05.20<strong>10</strong> PT 20.09.20<strong>10</strong><br />

RO 19.05.20<strong>10</strong> SI 19.05.20<strong>10</strong><br />

SK 19.05.20<strong>10</strong><br />

(11) 1 519 792 (51) B05D 1/04<br />

(84) AT 23.06.20<strong>10</strong> (84) PT 25.<strong>10</strong>.20<strong>10</strong><br />

CZ 23.06.20<strong>10</strong> EE 23.06.20<strong>10</strong><br />

FI 23.06.20<strong>10</strong> GR 24.09.20<strong>10</strong><br />

NL 23.06.20<strong>10</strong> RO 23.06.20<strong>10</strong><br />

SI 23.06.20<strong>10</strong> SK 23.06.20<strong>10</strong><br />

(11) 1 519 833 (51) B32B 5/26<br />

(84) AT 26.06.2006 (84) BE 30.06.2006<br />

BG 08.06.2006 CH 30.06.2007<br />

CY 08.03.2006 CZ 08.03.2006<br />

DK 08.06.2006 EE 08.03.2006<br />

FI 26.06.20<strong>10</strong> GB 26.06.2009<br />

GR 09.06.2006 HU 09.09.2006<br />

IE 08.03.2006 LI 30.06.2007<br />

LU 26.06.2006 MC 30.06.2006<br />

NL 01.01.20<strong>10</strong> PT 08.08.2006<br />

RO 08.03.2006 SI 08.03.2006<br />

SK 08.03.2006 TR 08.03.2006<br />

(11) 1 519 933 (51) C07D 453/02<br />

(84) AT 12.05.20<strong>10</strong> (84) CY 12.05.20<strong>10</strong><br />

CZ 12.05.20<strong>10</strong> DK 12.05.20<strong>10</strong><br />

EE 12.05.20<strong>10</strong> ES 23.08.20<strong>10</strong><br />

FI 12.05.20<strong>10</strong> GR 13.08.20<strong>10</strong><br />

MC 30.06.20<strong>10</strong> NL 12.05.20<strong>10</strong><br />

PT 13.09.20<strong>10</strong> RO 12.05.20<strong>10</strong><br />

SE 12.05.20<strong>10</strong> SI 12.05.20<strong>10</strong><br />

SK 12.05.20<strong>10</strong><br />

(11) 1 519 943 (51) A61K 31/57<br />

(84) AT 28.04.20<strong>10</strong> (84) CY 28.04.20<strong>10</strong><br />

CZ 28.04.20<strong>10</strong> DK 28.04.20<strong>10</strong><br />

EE 28.04.20<strong>10</strong> ES 08.08.20<strong>10</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!