27.06.2013 Views

Proceedings of the 8th International Conference on Intellectual ...

Proceedings of the 8th International Conference on Intellectual ...

Proceedings of the 8th International Conference on Intellectual ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Marko Anzelak et al.<br />

knowledge basis <str<strong>on</strong>g>of</str<strong>on</strong>g> superior quality. In this way, it is possible to ensure <str<strong>on</strong>g>the</str<strong>on</strong>g> rapid retrieval <str<strong>on</strong>g>of</str<strong>on</strong>g> stored<br />

knowledge in <str<strong>on</strong>g>the</str<strong>on</strong>g> l<strong>on</strong>g term (Collins 1993).<br />

Data that are specific to producti<strong>on</strong> processes or customers are stored in an ERP system toge<str<strong>on</strong>g>the</str<strong>on</strong>g>r<br />

with <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> element. Customers may have special requirements, which are stored in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

ERP-System and are important needs for <str<strong>on</strong>g>the</str<strong>on</strong>g> design (Handlbauer 2009). The link to <str<strong>on</strong>g>the</str<strong>on</strong>g> associated<br />

drawings is established through <str<strong>on</strong>g>the</str<strong>on</strong>g> use <str<strong>on</strong>g>of</str<strong>on</strong>g> a unique parts number. Automatic linking is not provided,<br />

and documents or guidelines are also not linked. However, at this time, <str<strong>on</strong>g>the</str<strong>on</strong>g> ERP system is <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>on</strong>ly<br />

system that allows <str<strong>on</strong>g>the</str<strong>on</strong>g> user to represent <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>necti<strong>on</strong> between <str<strong>on</strong>g>the</str<strong>on</strong>g> parts and <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong><br />

groups. This functi<strong>on</strong>ality is well-used, though it is subject to <strong>on</strong>e point <str<strong>on</strong>g>of</str<strong>on</strong>g> criticism with regard to <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

difficulty <str<strong>on</strong>g>of</str<strong>on</strong>g> finding associated drawings.<br />

Figure 3: Target situati<strong>on</strong><br />

It is our aim to provide <str<strong>on</strong>g>the</str<strong>on</strong>g> designer with <strong>on</strong>e system, which is able to meet <str<strong>on</strong>g>the</str<strong>on</strong>g> entire range <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

requirements. In our project, <strong>on</strong>e opti<strong>on</strong> would have been to use an existing ERP system as our basis,<br />

adding <str<strong>on</strong>g>the</str<strong>on</strong>g> additi<strong>on</strong>al informati<strong>on</strong> by using meta data sheets. Opti<strong>on</strong> 2 is <str<strong>on</strong>g>the</str<strong>on</strong>g> development <str<strong>on</strong>g>of</str<strong>on</strong>g> a<br />

separate applicati<strong>on</strong>. We opted for <str<strong>on</strong>g>the</str<strong>on</strong>g> separate applicati<strong>on</strong>, because we want to <str<strong>on</strong>g>of</str<strong>on</strong>g>fer all users<br />

unrestricted access and maximum comfort during data entry and data searching, which would not<br />

have been possible given <str<strong>on</strong>g>the</str<strong>on</strong>g> limited flexibility <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> ERP system. The applicati<strong>on</strong> provides <str<strong>on</strong>g>the</str<strong>on</strong>g> user<br />

with a tree structure, in which drawings and associated meta data are stored. The meta data are<br />

semi-structured, which means − <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>on</strong>e hand − that <str<strong>on</strong>g>the</str<strong>on</strong>g> range <str<strong>on</strong>g>of</str<strong>on</strong>g> data to be entered is reduced<br />

with predefined selecti<strong>on</strong> opti<strong>on</strong>s. On <str<strong>on</strong>g>the</str<strong>on</strong>g> o<str<strong>on</strong>g>the</str<strong>on</strong>g>r hand, this allows greater scope for <str<strong>on</strong>g>the</str<strong>on</strong>g> storage <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

informati<strong>on</strong>. Fur<str<strong>on</strong>g>the</str<strong>on</strong>g>rmore, <str<strong>on</strong>g>the</str<strong>on</strong>g> meta data are stored toge<str<strong>on</strong>g>the</str<strong>on</strong>g>r with all links to <str<strong>on</strong>g>the</str<strong>on</strong>g> additi<strong>on</strong>ally relevant<br />

documents, which means that all required informati<strong>on</strong> is available at a glance. This also ensures a<br />

c<strong>on</strong>necti<strong>on</strong> to <str<strong>on</strong>g>the</str<strong>on</strong>g> ERP system, as it is possible to transfer between <str<strong>on</strong>g>the</str<strong>on</strong>g> systems using <str<strong>on</strong>g>the</str<strong>on</strong>g>se links.<br />

The possibility also exists to link different parts by using this structure. However, <str<strong>on</strong>g>the</str<strong>on</strong>g> individual part is<br />

embedded in a hierarchy due to its comp<strong>on</strong>ent group, and this type <str<strong>on</strong>g>of</str<strong>on</strong>g> data entry is <strong>on</strong>ly really feasible<br />

and comprehensive when a very good knowledge <str<strong>on</strong>g>of</str<strong>on</strong>g> all available parts is available. Even when<br />

designers have knowledge <str<strong>on</strong>g>of</str<strong>on</strong>g> virtually every part, it remains difficult to justify <str<strong>on</strong>g>the</str<strong>on</strong>g> necessary<br />

expenditure <str<strong>on</strong>g>of</str<strong>on</strong>g> time required for setting up <str<strong>on</strong>g>the</str<strong>on</strong>g> links. This is why <str<strong>on</strong>g>the</str<strong>on</strong>g> project intends to use an<br />

automati<strong>on</strong> algorithm in order to reduce <str<strong>on</strong>g>the</str<strong>on</strong>g> amount <str<strong>on</strong>g>of</str<strong>on</strong>g> time required to merely checking <str<strong>on</strong>g>the</str<strong>on</strong>g> data.<br />

Although this process is not much less time-intensive than <str<strong>on</strong>g>the</str<strong>on</strong>g> process <str<strong>on</strong>g>of</str<strong>on</strong>g> establishing <str<strong>on</strong>g>the</str<strong>on</strong>g> links, it is<br />

subjectively perceived as a far simpler and more pleasant task. While <str<strong>on</strong>g>the</str<strong>on</strong>g> system does require greater<br />

effort <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> part <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> designers, <str<strong>on</strong>g>the</str<strong>on</strong>g> majority never<str<strong>on</strong>g>the</str<strong>on</strong>g>less realise that this is necessary in order to<br />

achieve greater overall efficiency in terms <str<strong>on</strong>g>of</str<strong>on</strong>g> effort and time. Most employees <str<strong>on</strong>g>the</str<strong>on</strong>g>refore have a<br />

positive attitude towards <str<strong>on</strong>g>the</str<strong>on</strong>g> project, with many even regarding it as an urgently required measure<br />

(D<strong>on</strong>g 2009).<br />

The project is implemented in two phases. During <str<strong>on</strong>g>the</str<strong>on</strong>g> first phase, a data sheet was developed for <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> elements to record <str<strong>on</strong>g>the</str<strong>on</strong>g> meta data bel<strong>on</strong>ging to a drawing (Figure 4). A directory tree was<br />

created, in which <str<strong>on</strong>g>the</str<strong>on</strong>g> drawings were classified. Depending <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> requirements, this directory tree can<br />

be based <strong>on</strong> a range <str<strong>on</strong>g>of</str<strong>on</strong>g> criteria. This allows both an organisati<strong>on</strong>-structure-view, and a project-<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!