17.08.2013 Views

Recycling Treated Municipal Wastewater for Industrial Water Use

Recycling Treated Municipal Wastewater for Industrial Water Use

Recycling Treated Municipal Wastewater for Industrial Water Use

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Diam (in)<br />

Annual<br />

Average<br />

Day Flow<br />

Annual<br />

Average Day<br />

Pipe Velocity<br />

at Peak<br />

Hourly Flow<br />

Pipe Unit<br />

Project<br />

Cost ($/ft)<br />

(mgd) Flow (gpm)<br />

Peak Hourly<br />

Flow (mgd) (fps)<br />

4 0.10 69.40 0.30 5.32 97<br />

6 0.20 138.80 0.60 4.73 106<br />

6 0.27 187.38 0.81 6.38 106<br />

8 0.40 277.60 1.20 5.32 115<br />

8 0.47 326.18 1.41 6.25 115<br />

8 0.53 367.82 1.59 7.05 115<br />

10 0.60 416.40 1.80 5.11 128<br />

10 0.67 464.98 2.01 5.70 128<br />

10 0.83 576.02 2.49 7.06 128<br />

12 0.93 645.42 2.79 5.50 140<br />

12 1.00 694.00 3.00 5.91 140<br />

12 1.17 811.98 3.51 6.91 140<br />

14 1.33 923.02 3.99 5.77 157<br />

14 1.50 1041.00 4.50 6.51 157<br />

14 1.67 1158.98 5.01 7.25 157<br />

16 1.83 1270.02 5.49 6.08 189<br />

16 2.00 1388.00 6.00 6.65 189<br />

16 2.07 1436.58 6.21 6.88 189<br />

18 2.17 1505.98 6.51 5.70 211<br />

18 2.33 1617.02 6.99 6.12 211<br />

18 2.50 1735.00 7.50 6.57 211<br />

18 2.67 1852.98 8.01 7.01 211<br />

20 2.83 1964.02 8.49 6.02 236<br />

20 3.00 2082.00 9.00 6.38 236<br />

20 3.17 2199.98 9.51 6.74 236<br />

20 3.33 2311.02 9.99 7.08 236<br />

24 3.50 2429.00 10.50 5.17 284<br />

24 3.67 2546.98 11.01 5.42 284<br />

24 3.83 2658.02 11.49 5.66 284<br />

24 4.00 2776.00 12.00 5.91 284<br />

24 4.17 2893.98 12.51 6.16 284<br />

24 4.33 3005.02 12.99 6.40 284<br />

24 4.50 3123.00 13.50 6.65 284<br />

24 4.67 3240.98 14.01 6.90 284<br />

30 5.33 3699.02 15.99 5.04 353<br />

30 5.67 3934.98 17.01 5.36 353<br />

30 6.00 4164.00 18.00 5.67 353<br />

30 6.33 4393.02 18.99 5.99 353<br />

30 6.67 4628.98 20.01 6.31 353<br />

30 7.00 4858.00 21.00 6.62 353<br />

30 7.33 5087.02 21.99 6.93 353<br />

36 8.00 5552.00 24.00 5.25 434<br />

36 8.33 5781.02 24.99 5.47 434<br />

36 8.67 6016.98 26.01 5.69 434<br />

36 9.00 6246.00 27.00 5.91 434<br />

36 9.33 6475.02 27.99 6.13 434<br />

36 9.67 6710.98 29.01 6.35 434<br />

36 10.00 6940.00 30.00 6.57 434<br />

36 10.33 7169.02 30.99 6.78 434<br />

36 10.50 7287.00 31.50 6.89 434<br />

36 10.67 7404.98 32.01 7.01 434<br />

42 11.33 7863.02 33.99 5.47 531<br />

Capital PROJECT Cost Curves <strong>for</strong> Reclaimed Transmission Piping<br />

Urban - Annualized Capital Cost - $/yr<br />

1 1.5 2 2.5 3 3.5 4 4.5 5 10<br />

$39,531 $59,297 $79,063 $98,829 $118,594 $138,360 $158,126 $177,891 $197,657 $395,314<br />

$43,199 $64,799 $86,399 $107,998 $129,598 $151,198 $172,797 $194,397 $215,997 $431,993<br />

$43,199 $64,799 $86,399 $107,998 $129,598 $151,198 $172,797 $194,397 $215,997 $431,993<br />

$46,867 $70,301 $93,734 $117,168 $140,602 $164,035 $187,469 $210,902 $234,336 $468,672<br />

$46,867 $70,301 $93,734 $117,168 $140,602 $164,035 $187,469 $210,902 $234,336 $468,672<br />

$46,867 $70,301 $93,734 $117,168 $140,602 $164,035 $187,469 $210,902 $234,336 $468,672<br />

$52,165 $78,248 $104,330 $130,413 $156,496 $182,578 $208,661 $234,743 $260,826 $521,652<br />

$52,165 $78,248 $104,330 $130,413 $156,496 $182,578 $208,661 $234,743 $260,826 $521,652<br />

$52,165 $78,248 $104,330 $130,413 $156,496 $182,578 $208,661 $234,743 $260,826 $521,652<br />

$57,056 $85,584 $114,111 $142,639 $171,167 $199,695 $228,223 $256,751 $285,278 $570,557<br />

$57,056 $85,584 $114,111 $142,639 $171,167 $199,695 $228,223 $256,751 $285,278 $570,557<br />

$57,056 $85,584 $114,111 $142,639 $171,167 $199,695 $228,223 $256,751 $285,278 $570,557<br />

$63,984 $95,976 $127,968 $159,960 $191,952 $223,944 $255,936 $287,927 $319,919 $639,839<br />

$63,984 $95,976 $127,968 $159,960 $191,952 $223,944 $255,936 $287,927 $319,919 $639,839<br />

$63,984 $95,976 $127,968 $159,960 $191,952 $223,944 $255,936 $287,927 $319,919 $639,839<br />

$77,025 $115,538 $154,050 $192,563 $231,076 $269,588 $308,101 $346,613 $385,126 $770,252<br />

$77,025 $115,538 $154,050 $192,563 $231,076 $269,588 $308,101 $346,613 $385,126 $770,252<br />

$77,025 $115,538 $154,050 $192,563 $231,076 $269,588 $308,101 $346,613 $385,126 $770,252<br />

$85,991 $128,987 $171,982 $214,978 $257,973 $300,969 $343,964 $386,960 $429,955 $859,911<br />

$85,991 $128,987 $171,982 $214,978 $257,973 $300,969 $343,964 $386,960 $429,955 $859,911<br />

$85,991 $128,987 $171,982 $214,978 $257,973 $300,969 $343,964 $386,960 $429,955 $859,911<br />

$85,991 $128,987 $171,982 $214,978 $257,973 $300,969 $343,964 $386,960 $429,955 $859,911<br />

$96,180 $144,269 $192,359 $240,449 $288,539 $336,629 $384,718 $432,808 $480,898 $961,796<br />

$96,180 $144,269 $192,359 $240,449 $288,539 $336,629 $384,718 $432,808 $480,898 $961,796<br />

$96,180 $144,269 $192,359 $240,449 $288,539 $336,629 $384,718 $432,808 $480,898 $961,796<br />

$96,180 $144,269 $192,359 $240,449 $288,539 $336,629 $384,718 $432,808 $480,898 $961,796<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$115,742 $173,612 $231,483 $289,354 $347,225 $405,095 $462,966 $520,837 $578,708 $1,157,415<br />

$143,862 $215,793 $287,724 $359,655 $431,586 $503,516 $575,447 $647,378 $719,309 $1,438,618<br />

$143,862 $215,793 $287,724 $359,655 $431,586 $503,516 $575,447 $647,378 $719,309 $1,438,618<br />

$143,862 $215,793 $287,724 $359,655 $431,586 $503,516 $575,447 $647,378 $719,309 $1,438,618<br />

$143,862 $215,793 $287,724 $359,655 $431,586 $503,516 $575,447 $647,378 $719,309 $1,438,618<br />

$143,862 $215,793 $287,724 $359,655 $431,586 $503,516 $575,447 $647,378 $719,309 $1,438,618<br />

$143,862 $215,793 $287,724 $359,655 $431,586 $503,516 $575,447 $647,378 $719,309 $1,438,618<br />

$143,862 $215,793 $287,724 $359,655 $431,586 $503,516 $575,447 $647,378 $719,309 $1,438,618<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$176,873 $265,309 $353,745 $442,182 $530,618 $619,054 $707,491 $795,927 $884,363 $1,768,726<br />

$216,404 $324,606 $432,808 $541,010 $649,212 $757,414 $865,616 $973,818 $1,082,020 $2,164,041<br />

Pipe Capital Costs_Single_PF of 3_FINAL.xls, Capital Costs Page 3 of 6 3/30/2007 2:55 PM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!