17.08.2013 Views

Recycling Treated Municipal Wastewater for Industrial Water Use

Recycling Treated Municipal Wastewater for Industrial Water Use

Recycling Treated Municipal Wastewater for Industrial Water Use

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Diam (in)<br />

Annual<br />

Average<br />

Day Flow<br />

(mgd)<br />

Annual<br />

Average Day Peak Hourly<br />

Flow (gpm) Flow (mgd)<br />

Pipe Velocity<br />

at Peak<br />

Hourly Flow<br />

(fps)<br />

Pipe Unit<br />

Project<br />

Cost ($/ft)<br />

42 11.67 8098.98 35.01 5.63 531<br />

42 12.00 8328.00 36.00 5.79 531<br />

42 12.33 8557.02 36.99 5.95 531<br />

42 12.67 8792.98 38.01 6.11 531<br />

42 13.00 9022.00 39.00 6.27 531<br />

42 13.33 9251.02 39.99 6.43 531<br />

42 13.67 9486.98 41.01 6.59 531<br />

42 14.00 9716.00 42.00 6.75 531<br />

42 14.67 10180.98 44.01 7.08 531<br />

48 13.67 9486.98 41.01 5.05 671<br />

48 14.00 9716.00 42.00 5.17 671<br />

48 14.33 9945.02 42.99 5.29 671<br />

48 14.67 10180.98 44.01 5.42 671<br />

48 15.00 10410.00 45.00 5.54 671<br />

48 15.33 10639.02 45.99 5.66 671<br />

48 15.67 10874.98 47.01 5.79 671<br />

48 16.00 11104.00 48.00 5.91 671<br />

48 16.33 11333.02 48.99 6.03 671<br />

48 16.67 11568.98 50.01 6.16 671<br />

48 17.33 12027.02 51.99 6.40 671<br />

48 18.00 12492.00 54.00 6.65 671<br />

48 18.33 12721.02 54.99 6.77 671<br />

48 19.00 13186.00 57.00 7.02 671<br />

54 17.33 12027.02 51.99 5.06 781<br />

54 18.00 12492.00 54.00 5.25 781<br />

54 18.67 12956.98 56.01 5.45 781<br />

54 19.33 13415.02 57.99 5.64 781<br />

54 20.00 13880.00 60.00 5.84 781<br />

54 20.67 14344.98 62.01 6.03 781<br />

54 21.33 14803.02 63.99 6.22 781<br />

54 22.00 15268.00 66.00 6.42 781<br />

54 22.67 15732.98 68.01 6.62 781<br />

54 23.33 16191.02 69.99 6.81 781<br />

54 24.00 16656.00 72.00 7.00 781<br />

60 21.17 14691.98 63.51 5.00 891<br />

60 21.67 15038.98 65.01 5.12 891<br />

60 22.33 15497.02 66.99 5.28 891<br />

60 23.00 15962.00 69.00 5.44 891<br />

60 23.67 16426.98 71.01 5.60 891<br />

60 24.33 16885.02 72.99 5.75 891<br />

60 25.00 17350.00 75.00 5.91 891<br />

60 25.67 17814.98 77.01 6.07 891<br />

60 26.33 18273.02 78.99 6.22 891<br />

60 27.00 18738.00 81.00 6.38 891<br />

60 27.67 19202.98 83.01 6.54 891<br />

60 28.33 19661.02 84.99 6.70 891<br />

60 29.00 20126.00 87.00 6.86 891<br />

60 30.00 20820.00 90.00 7.09 891<br />

Capital PROJECT Cost Curves <strong>for</strong> Reclaimed Transmission Piping<br />

Urban Capital Cost - Cost per 1000 gallons<br />

1 1.5 2 2.5 3 3.5 4 5 10<br />

$0.05 $0.08 $0.10 $0.13 $0.15 $0.18 $0.20 $0.23 $0.25 $0.51<br />

$0.05 $0.07 $0.10 $0.12 $0.15 $0.17 $0.20 $0.22 $0.25 $0.49<br />

$0.05 $0.07 $0.10 $0.12 $0.14 $0.17 $0.19 $0.22 $0.24 $0.48<br />

$0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.19 $0.21 $0.23 $0.47<br />

$0.05 $0.07 $0.09 $0.11 $0.14 $0.16 $0.18 $0.21 $0.23 $0.46<br />

$0.04 $0.07 $0.09 $0.11 $0.13 $0.16 $0.18 $0.20 $0.22 $0.44<br />

$0.04 $0.07 $0.09 $0.11 $0.13 $0.15 $0.17 $0.20 $0.22 $0.43<br />

$0.04 $0.06 $0.08 $0.11 $0.13 $0.15 $0.17 $0.19 $0.21 $0.42<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.18 $0.20 $0.40<br />

$0.05 $0.08 $0.11 $0.14 $0.16 $0.19 $0.22 $0.25 $0.27 $0.55<br />

$0.05 $0.08 $0.11 $0.13 $0.16 $0.19 $0.21 $0.24 $0.27 $0.54<br />

$0.05 $0.08 $0.10 $0.13 $0.16 $0.18 $0.21 $0.24 $0.26 $0.52<br />

$0.05 $0.08 $0.10 $0.13 $0.15 $0.18 $0.20 $0.23 $0.26 $0.51<br />

$0.05 $0.07 $0.10 $0.12 $0.15 $0.17 $0.20 $0.22 $0.25 $0.50<br />

$0.05 $0.07 $0.10 $0.12 $0.15 $0.17 $0.20 $0.22 $0.24 $0.49<br />

$0.05 $0.07 $0.10 $0.12 $0.14 $0.17 $0.19 $0.22 $0.24 $0.48<br />

$0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.19 $0.21 $0.23 $0.47<br />

$0.05 $0.07 $0.09 $0.11 $0.14 $0.16 $0.18 $0.21 $0.23 $0.46<br />

$0.04 $0.07 $0.09 $0.11 $0.13 $0.16 $0.18 $0.20 $0.22 $0.45<br />

$0.04 $0.06 $0.09 $0.11 $0.13 $0.15 $0.17 $0.19 $0.22 $0.43<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.15 $0.17 $0.19 $0.21 $0.42<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.18 $0.20 $0.41<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.18 $0.20 $0.39<br />

$0.05 $0.08 $0.10 $0.13 $0.15 $0.18 $0.20 $0.23 $0.25 $0.50<br />

$0.05 $0.07 $0.10 $0.12 $0.15 $0.17 $0.19 $0.22 $0.24 $0.48<br />

$0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.19 $0.21 $0.23 $0.47<br />

$0.05 $0.07 $0.09 $0.11 $0.14 $0.16 $0.18 $0.20 $0.23 $0.45<br />

$0.04 $0.07 $0.09 $0.11 $0.13 $0.15 $0.17 $0.20 $0.22 $0.44<br />

$0.04 $0.06 $0.08 $0.11 $0.13 $0.15 $0.17 $0.19 $0.21 $0.42<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.18 $0.20 $0.41<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.18 $0.20 $0.40<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.13 $0.15 $0.17 $0.19 $0.38<br />

$0.04 $0.06 $0.07 $0.09 $0.11 $0.13 $0.15 $0.17 $0.19 $0.37<br />

$0.04 $0.05 $0.07 $0.09 $0.11 $0.13 $0.15 $0.16 $0.18 $0.36<br />

$0.05 $0.07 $0.09 $0.12 $0.14 $0.16 $0.19 $0.21 $0.23 $0.47<br />

$0.05 $0.07 $0.09 $0.11 $0.14 $0.16 $0.18 $0.21 $0.23 $0.46<br />

$0.04 $0.07 $0.09 $0.11 $0.13 $0.16 $0.18 $0.20 $0.22 $0.45<br />

$0.04 $0.06 $0.09 $0.11 $0.13 $0.15 $0.17 $0.19 $0.22 $0.43<br />

$0.04 $0.06 $0.08 $0.11 $0.13 $0.15 $0.17 $0.19 $0.21 $0.42<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.18 $0.20 $0.41<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.18 $0.20 $0.40<br />

$0.04 $0.06 $0.08 $0.10 $0.12 $0.14 $0.16 $0.17 $0.19 $0.39<br />

$0.04 $0.06 $0.08 $0.09 $0.11 $0.13 $0.15 $0.17 $0.19 $0.38<br />

$0.04 $0.06 $0.07 $0.09 $0.11 $0.13 $0.15 $0.17 $0.18 $0.37<br />

$0.04 $0.05 $0.07 $0.09 $0.11 $0.13 $0.14 $0.16 $0.18 $0.36<br />

$0.04 $0.05 $0.07 $0.09 $0.11 $0.12 $0.14 $0.16 $0.18 $0.35<br />

$0.03 $0.05 $0.07 $0.09 $0.10 $0.12 $0.14 $0.15 $0.17 $0.34<br />

$0.03 $0.05 $0.07 $0.08 $0.10 $0.12 $0.13 $0.15 $0.17 $0.33<br />

Pipe Capital Costs_Single_PF of 3_FINAL.xls, Capital Costs Page 6 of 6 3/30/2007 2:55 PM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!