17.08.2013 Views

Recycling Treated Municipal Wastewater for Industrial Water Use

Recycling Treated Municipal Wastewater for Industrial Water Use

Recycling Treated Municipal Wastewater for Industrial Water Use

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MCES <strong>Recycling</strong> <strong>Treated</strong> <strong>Wastewater</strong> <strong>for</strong> <strong>Industrial</strong> Reuse Project<br />

Meeting Summary<br />

Meeting: <strong>Municipal</strong> <strong>Wastewater</strong> Reuse Regulatory Stakeholder Group<br />

Meeting No.: ME02 Date: 6/12/06<br />

Location: 390 Robert Street, Rm B Lower Level Time: 2:00 – 3:30 PM<br />

Not a well-known topic in Minnesota.<br />

<strong>Industrial</strong> sector may need some education in this area. Industries are use to<br />

internally using water, but not ‘reuse’ of water from another supply, like municipal<br />

WWTPs.<br />

6. Other Stakeholders to Involve<br />

Minnesota Environmental Initiative<br />

Minnesota Environmental Partnership<br />

o Over 90 groups<br />

o Help organize groups <strong>for</strong> specific issues<br />

Concurrent project: MCES Regional <strong>Water</strong> Supply Assessment<br />

Southwest and Northwest Metro Area Ground <strong>Water</strong> Groups<br />

Clean <strong>Water</strong> Cabinet<br />

<strong>Industrial</strong><br />

o Mining (iron range)<br />

o Red River Basin Committee (well organized group that had addressed<br />

ground water supply and surface water <strong>for</strong> the watershed)<br />

o Corn Growers (ethanol)<br />

o MEP<br />

o Chamber of Commerce – talk with Mike Robertson<br />

7. Summary<br />

Plan to look to the <strong>Water</strong> Supply Advisory group <strong>for</strong> involvement and tie in the<br />

water supply driver.<br />

Additional meetings with the planning/regulatory stakeholders at this meeting and<br />

an expanded list of stakeholders will be held, with the timing of the meeting(s)<br />

dependent on the other stakeholders that are brought into the project.<br />

Decisions:<br />

No major decisions reached. The intent of this meeting was discussion and in<strong>for</strong>mationsharing.<br />

MCES Project No. 070186 Page 3 of 3<br />

CCE Project No. 06002<br />

CDM Project No. 50855

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!