04.11.2014 Views

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Overview<br />

3 C-LAN <strong>Admin</strong>istration<br />

✔<br />

Checklist Item<br />

3 Remove old circuit packs:<br />

~ Turn off the power.<br />

~ For the csi model, remove the Processor (TN798) circuit pack (Don’t<br />

remove the processor circuit pack if it is a TN798B).<br />

~ For the si model, remove the Processor (TN790), PACCON (TN778),<br />

and NETCON (TN777) circuit packs. If there are X.25 connections<br />

that the customer wants to keep, leave the PI (TN765) circuit pack in<br />

the switch; otherwise remove it.<br />

~ For the r model, if there are X.25 connections that the customer wants<br />

to keep, leave the PGATE (TN755) circuit pack in the switch;<br />

otherwise, remove it.<br />

4 Install new circuit packs on all switches upgrading from a pre-R7<br />

software load to R8:<br />

~ For csi models: install the TN798B (processor) and TN799B<br />

(C-LAN) circuit packs.<br />

~ For si models: install the TN790B (processor), TN794 (NetPkt), and<br />

TN799B (C-LAN) circuit packs. For any PPN or EPN that will be<br />

carrying packet data, replace the TN776 (Expansion Interface) with<br />

the TN570B or TN570C circuit pack.<br />

~ For r models: install TN799B (C-LAN.)<br />

The C-LAN circuit pack is required <strong>for</strong> TCP/IP (ppp and ethernet)<br />

connections. In all cases, the R8 software will run without the TN799B<br />

(C-LAN) circuit pack; all other new circuit packs are required <strong>for</strong> R8.<br />

5 Install the R8.1 Software on all switches upgrading to R8.1<br />

6 Copy translations from translations flash card or tape (G3r). Use the<br />

“working” flash card if step 3 was per<strong>for</strong>med.<br />

NEW and UPGRADE Systems — the following items apply to both new systems<br />

and systems being upgraded to R8 from a previous release. For more in<strong>for</strong>mation<br />

about the checklist item, refer to the appropriate installation book in "References",<br />

page 56.<br />

7 Established physical connections at each node.<br />

8 Set software version on the System Parameters Customer Options <strong>for</strong>m.<br />

General <strong>Admin</strong>istration <strong>for</strong> new installations — the following translations should<br />

already be in place <strong>for</strong> existing systems and usually should not need to be changed<br />

<strong>for</strong> an upgrade to R8 unless new nodes are being added to the network. Refer to<br />

appendix A <strong>for</strong> more in<strong>for</strong>mation about these tasks.<br />

9 DS1 circuit packs administered<br />

2 of 3<br />

<strong>Admin</strong>istration <strong>for</strong> <strong>Network</strong> <strong>Connectivity</strong><br />

555-233-504 — Issue 1 — April 2000 CID: 77730<br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!