04.11.2014 Views

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Overview<br />

3 C-LAN <strong>Admin</strong>istration<br />

TCP/IP connections (ppp or ethernet) require DEFINITY <strong>ECS</strong> Release 7 or later<br />

hardware and software. ISDN and BX.25 connections are supported on switches<br />

upgrading to R8 and pre-R7 switches can be connected to R8 switches via ISDN or<br />

BX.25. However, new systems will not be sold with X.25 connections. There<strong>for</strong>e, all<br />

switches in the five configurations are assumed to be upgraded to release R7 or later<br />

except the si connected via BX.25 and the csi connected via ISDN in configurations 3<br />

and 4 — these 2 switches could be either R7 or pre-R7 versions.<br />

Organization of this chapter<br />

The descriptions of the configurations have a <strong>com</strong>mon <strong>for</strong>mat. Each configuration<br />

section has the following subsections:<br />

• Configuration overview<br />

• Task summary<br />

• Checklist of prerequisite tasks<br />

• Configuration diagram<br />

• <strong>Admin</strong>istration tasks<br />

The subsections are described below.<br />

Configuration Overview Each of the configuration sections begins with a brief description of the network<br />

represented by the configuration. This section includes a high-level diagram and a<br />

description of the switches and their connections <strong>for</strong> each node in the network.<br />

Task Summary<br />

Lists the tasks that need to be per<strong>for</strong>med to administer this configuration.<br />

1 Review checklist<br />

2 Assign node names<br />

3 Assign links<br />

4 Assign processor channels<br />

Procedures <strong>for</strong> <strong>com</strong>pleting each of these tasks are described in detail following this<br />

summary.<br />

Configuration Diagram<br />

A detailed diagram of the configuration is shown after the task summary. The<br />

diagram is in two parts — one part showing the software-defined connections and the<br />

other part showing the hardware connections. The diagram shows many of the<br />

parameters that are entered on the administration screens.<br />

<strong>Admin</strong>istration <strong>for</strong> <strong>Network</strong> <strong>Connectivity</strong><br />

555-233-504 — Issue 1 — April 2000 CID: 77730<br />

57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!