04.11.2014 Views

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Configuration 1: R8r R8si<br />

3 C-LAN <strong>Admin</strong>istration<br />

Switch 2 Task — Assign Processor Channels<br />

This task associates data links (hardware) with processor channels (software) on<br />

Switch 2.<br />

Steps<br />

Begin<br />

> Open the Processor Channel Assignment <strong>for</strong>m — enter ch <strong>com</strong> p<br />

change <strong>com</strong>munications-interface processor-channels<br />

PROCESSOR CHANNEL ASSIGNMENT<br />

Page 1 of X<br />

Proc Gtwy Interface Destination Session Mach<br />

Chan Enable Appl. To Mode Link/Chan Node Port Local/Remote ID<br />

1: n _______ _ __ _____ __________ 0____ ___ ___ __<br />

2: n _______ _ __ _____ __________ 0____ ___ ___ __<br />

:<br />

21: y dcs ___ c 3_ 0____ node-1____ 5003 21_ 12_ 1_<br />

:<br />

64: n _______ _ __ _____ __________ 0____ ___ ___ __<br />

> Enter values<br />

Field<br />

Conditions/Comments<br />

Processor Channel 21: (ppp connection to Switch 1)<br />

Enable Set to y.<br />

Appl.<br />

Set to dcs <strong>for</strong> DCS signaling.<br />

Mode<br />

Node-2 is the “client” <strong>for</strong> this session. Set node-1 to “server”<br />

(s).<br />

Interface Link This must match the link number on the node-2 data module<br />

screen in the previous task.<br />

Interface Chan A value of 0 allows any available interface channel to be used<br />

<strong>for</strong> this connection. The Destination Port number on the<br />

Switch-1 Processor Channel screen must also be set to 0.<br />

Destination Node Name of the far-end node <strong>for</strong> this channel. This must be a<br />

name entered on the Node Names screen. For ppp<br />

connections, it must match the Destination Node Name<br />

entered on the ppp Data Module screen.<br />

Destination Port This number must match the Interface Channel number<br />

assigned on the Switch-1 Processor Channel screen.<br />

1 of 2<br />

70<br />

<strong>Admin</strong>istration <strong>for</strong> <strong>Network</strong> <strong>Connectivity</strong><br />

CID: 77730 555-233-504 — Issue 1 — April 2000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!