04.11.2014 Views

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

Definity ECS Admin for Network Connectivity.pdf - TextFiles.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Overview<br />

3 C-LAN <strong>Admin</strong>istration<br />

✔<br />

Checklist Item<br />

10 Signaling group administered<br />

~ page 1 — Trunk board address and Interface ID<br />

~ Page 2 — <strong>Admin</strong>istered NCA TSC assignment<br />

11 Synchronization plan administered<br />

12 Trunk groups assigned<br />

13 Dial plan administered<br />

14 Uni<strong>for</strong>m dial plan administered<br />

15 AAR analysis administered<br />

16 Route pattern administered<br />

17 Hunt groups assigned<br />

3 of 3<br />

Configurations<br />

The task descriptions are presented in six relatively simple configurations. Each<br />

configuration describes how to administer either a 2-switch connection or a 3-switch<br />

gateway connection. The procedures <strong>for</strong> administering these configurations can be<br />

used either individually or in groups as “building blocks” <strong>for</strong> constructing most<br />

networks involving DEFINITY <strong>ECS</strong> R8 and pre-R7 switches.<br />

The following table lists the configurations described in this chapter.<br />

Configuration<br />

Switch<br />

2<br />

Connection<br />

1<br />

Switch<br />

1<br />

Connection<br />

2<br />

Switch<br />

3<br />

Page<br />

1 R7si ppp R7r page 60<br />

2 R7csi ethernet R7r<br />

(+CMS)<br />

page 73<br />

3 si bx.25 R7r ethernet R7si page 99<br />

4 csi isdn R7si ppp R7csi page 124<br />

5A R7csi ppp R7r ethernet R7si page 146<br />

5B R7csi ppp R7r<br />

(2 C-LAN<br />

boards)<br />

ethernet R7si page 171<br />

The first 2 configurations are simple 2-switch networks. The next two are 3-switch<br />

networks with Switch 1 serving as a gateway between different signaling types <strong>for</strong><br />

connection 1 and connection 2. The last two configurations are ppp–ethernet<br />

networks; 5B, is the same as 5A except the Switch 1 has two C-LAN boards instead<br />

of one.<br />

56<br />

<strong>Admin</strong>istration <strong>for</strong> <strong>Network</strong> <strong>Connectivity</strong><br />

CID: 77730 555-233-504 — Issue 1 — April 2000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!